ALICAT
Die letzten Häfen

Die letzten Wegpunkte

Die neuesten Nachrichten
Ferry suffered main engine issue
On Sep 1, the 'Ali Cat', serving on the route Gourock - Dunoon, suffered a technical issue with its port side main engine. As a consequence, the vessel had to be removed from service. The 'Argyll Flyer' continued operating a single vessel timetable.
Ferry sidelined due to technical issue
On the morning of Aug 19, the 'Ali Cat', serving on the route Gourock - Dunoon, suffered a technical issue with the port side main engine, that required further investigation and repairs. As a consequence, the scheduled departures at 06:35 a.m. and 07:45 a.m. from Gourock and at 07:05 a.m. and 08:15 a.m. from Dunoon were initially cancelled and then the ferry taken out of service and moved to Greenock for repairs. Due to a combination of the ongoing technical issue with the 'Ali Cat's port side main engine and essential maintenance works required on the ferry 'Argyll Flyer', all sailings on the route were cancelled on Aug 23. Starting on Aug 24 and until Sep 1, the 'Argyll Flyer' operated the following single vessel timetable: www.calm/ac/01
Ferry suffered technical issue
The 'Ali Cat', serving on the route Gourock - Dunoon, suffered a technical issue on the morning of Aug 5 and had to be sidelined for repairs. As a consequence, a single vessel service was operated by the ferry 'Argyll Flyer': Departure Gourock - 9:15 a.m., 10:45 a.m., 11:45 a.m., 12:45 p.m., 1:45 p.m., 2:45 p.m., 4:00 p.m. Departure Dunoon - 8:45 a.m., 9:45 a.m., 11:15 a.m., 12:15 p.m., 1:15 p.m., 2:15 p.m. After the issue was successfully resolved, the ferry resumed its service with the 4:30 p.m. sailing from Gourock.
News schreiben

