ANGELA
Die letzten Häfen

Die letzten Wegpunkte

Die neuesten Nachrichten
Detention in Bandirma
The "Angela" was detained on March 16, 2026, in Bandirma, Turkiye with ten deficiencies, five of which being regarded as seriously and grounds for a detention: 1) Life saving appliances - Launching arrangements for rescue boats Broken 2) Life saving appliances - Rescue boats Not ready for use 3) Water/Weathertight - Railing, gangway, walkway and means for safe passage Damaged 4) Structural conditions - Hull damage impairing seaworthiness Holed 5) Safety of navigation - Lights, shapes and sound-signals Inoperative The vessel was released again on March 23 and permitted a single voyage to Yalova for permanent repairs. The last detention was only on Nov 3, 2025, in Karadeniz Eregli with 27 deficiencies for theee days. https://www.facebook.com/share/p/1HmjumSKup/
Detention in Karadeniz Eregli
The"Angela" was detained on Nov 3, 2025, in Karadeniz Eregli with 27 deficiencies, 22 of which being regarded as seriously and grounds for a detention: 1) Certificate & Doc - Log-books/compulsory entries Not as required 2) Safety of navigation - Nautical publications Expired 3) Safety of navigation - Signalling lamp' Inoperative 4) Structural conditions - Beams, frames, floors-op.damage Not as required 5) Structural conditions - Decks - Corrosion Corroded 6) Structural conditions - Wheelbouse - doors - window Not as required 7) Structural conditions - Towing and mooring equipment Not as required 8)) Pollution Prevention - Other (Marpol Annex I) Other 9) Pollution Prevention - Marking and labelling Not as required 10) Fire safety - Fire pump and its pipes Inoperative 11) Fire safety - Ventilation Inoperative 12) Life saving Appliances - Inflatable liferafts Not as required 13) Water/Weathertight - Freeboard marks Not as required 14) Dangerous goods - Instrumentation Not as required 15) Other - Other safety in general Other 16) Living and working - Ventilation (Working spaces) Not as required 17) Living and working - Lighting (Working spaces) Not as required 18) Living and working - Pipes, wires (insulation) Not as required 19 LIving and working - Galley, handlingroom (Maintenance) Not as required 20) Living and working - Obstruction, slipping etc Not as required 21) Living and working - Messroom (location) Not as required 22) Living and working - Electrical Unsafe The vessel was released again on Nov 5 and left the port enroute to Sulina, where it anchored on Nov 7. https://www.facebook.com/share/p/1AF5T6tkLo/
Technical failure in Istanbul Strait
The "NS Angela", en route from Larnaca to Tekirdag, suffered a technical failure during the transit of the Istanbul Strait and dropped anchor at Karanlik Liman anchorage on June 19, 2018, at 11 a.m. The vessel's Strait passage permission was temporarily cancelled by the Strait authority until the completion of permanent repairs. After the repair works were carried out by the crew, the ship resumed sailing and berthed in the port of Tekirdag on June 20 at midnight.
News schreiben

