Allgemeine Informationen

IMO:
9355446
MMSI:
209719000
Rufzeichen:
5BBU3
Breite:
22.0 m
Länge:
140.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Cargo Ship
Ship type:
Flagge:
Cyprus
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
314.2° / 5.0
Kompasskurs:
313.0° / 5.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moving
Gebiet:
Netherlands
Zuletzt empfangen::
2026-11-08
vor < 1 Min
Source:
T-AIS
Von:
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 2 Min
Source:
T-AIS
Berechnete ETA:

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Bitte anmelden, um die letzten port calls zu sehen

Log in

Die letzten Wegpunkte

Bitte anmelden, um die letzten wegpunkte zu sehen

Log in

Die neuesten Nachrichten

Detention in Grangemouth

Thu Nov 13 09:22:46 CET 2025 Timsen

On Nov 6, 2025, the 'BG Ireland' was detained in Grangemouth with eight deficiencies, three of which being regarded as seriously and grounds for a detention: 1) Emergency systems - Crew familiarization with Emergency systems Not as required 2) Fire safety - Evaluation of crew performance Lack of familiarity 3) ISM - Ism certificate Not as required The vessel was released again on Nov and left the port enroute to Rotterdam, where it arrived on Nov 11 and remained stationary at the Hutchinson Delta 2 Terminal as of Nov 13. https://www.facebook.com/profile.php?id=100063576908591

Engine repairs in Emden completed

Tue Oct 28 09:36:58 CET 2025 Timsen

The technical malfunction aboard the 'BG Ireland' has forced the ship to make an unscheduled stop at the shipyard Emder Werft und Dock GmbH (EWD) in Emden, has been resolved. The issue was traced to a broken connecting rod bolt, which damaged the ship's MAK 9-cylinder 4-stroke engine. EWD engineers fully dismantled the old engine block, salvaging reusable parts. A new, 120-ton MAK engine was delivered to Emden and installed with the help of a floating crane—a rare and challenging operation according to project engineer Dennis König. Over the next three weeks, the ship's piping and coupling systems will be reinstalled, followed by a test phase since Oct 23. On Oct 26 at 10.40 p.m. the ship finally left Emden, next destined to Grangemouth with an ETA as of Oct 29.

Ship laid up in Emden after engine failure

Tue Sep 23 20:32:50 CEST 2025 Timsen

The 'BG Ireland' suffered an engine failurea pproximately 14 nautical miles off St Catherine’s Point, Isle of Wight, on June 20, 2025, one day after its departure from the port of Cork. The vessel was subsequently towed to Rotterdam on June 24, where the cargo of containers was discharged. She was towed to Emden on July 16 and has been laid up after its arrival on July 18 and remained stationary in the inner port as of Sep 23. It was curently unknown if she will return to service again with BG Freight Line or whether the charter has been terminated.

News schreiben

Ship master data