Allgemeine Informationen

IMO:
MMSI:
316027034
Rufzeichen:
Breite:
9.0 m
Länge:
24.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Passenger ship
Ship type:
Flagge:
Canada
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
338.6° / -128.0
Kompasskurs:
511.0° / -128.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Location:
Halifax (Halifax Harbour)
Gebiet:
Canada
Zuletzt empfangen::
2026-11-07
vor 1 Tag
Source:
T-AIS
Von:
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 1 Tag
Source:
T-AIS

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Bitte anmelden, um die letzten port calls zu sehen

Log in

Die letzten Wegpunkte

Bitte anmelden, um die letzten wegpunkte zu sehen

Log in

Die neuesten Nachrichten

Ferry suffered steering issue

Tue May 26 13:00:54 CEST 2026 Timsen

A steering issue with the 'Christopher Stannix' has cuts service to 30-minute intervals on te Alderney service May 20, 2026. After months-long repairs to the 'Vincent Coleman', the problems with the 'Christopher Stannix' caused more delays, just three days after returning to full service, the Alderney ferry was back to operating every 30 minutes on weekdays instead of every 15 minutes. It required replacement parts to address a steering issue which was similar to the one that kept the 'Vincent Coleman' out of operation for months and forced the ferry service to run on a 30-minute schedule since mid-January.

Ferry sidelined due to propulsion trouble

Thu Jul 16 11:38:21 CEST 2015 Timsen

Halifax Transit has been forced to take the "Christopher Stannix" out of service until further notice after its aft propulsion system failed on July 13, 2015. One of the two propulsion units on board was malfunctioningso the ferry had to takenout of the water. The propulsion system was supplied by the German company Voith Turbo at a cost of $1.1 million.It was not yet known if the damage was covered by a warranty. The assessment and any required repairs were expected to take several weeks. While technicians were trying to sort out what went wrong, Halifax Transit has reduced ferry service from the Woodside Terminal to once every half hour. Halifax Transit was trying to find out if Transport Canada would allow the Christopher Stannix to go under its own power to a local dry dock for whatever repairs were needed. In the interim, Halifax Transit says trips from the Woodside Ferry Terminal will depart on the :07 and :37, and trips from the Halifax Ferry Terminal will depart on the :22 and :52.

News schreiben

Ship master data