Allgemeine Informationen

IMO:
8128858
MMSI:
613931607
Rufzeichen:
TJM5211
Breite:
12.0 m
Länge:
100.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Cargo Ship
Ship type:
Flagge:
Cameroon
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moored
Kurs:
196.8° / 0.0
Kompasskurs:
278.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moored
Location:
Beirut (Beirut Port)
Gebiet:
Lebanon
Zuletzt empfangen::
2026-11-08
vor 2 Min
Source:
T-AIS
Von:
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 5 Min
Source:
T-AIS

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Bitte anmelden, um die letzten port calls zu sehen

Log in

Die letzten Wegpunkte

Bitte anmelden, um die letzten wegpunkte zu sehen

Log in

Die neuesten Nachrichten

Fifth detention since May 2025

Fri Oct 23 21:56:43 CEST 2026 Timsen

The 'Dieva' was detained for the fifth time since May 2025, this time on Oct 21, 2026, in Aliağa with 15 deficiencies, ten of which being regarded as seriously and grounds for a detention: 1) Certificate & Doc - Log books/compulsory entries Missing 2) Safety of navigation - Nautical publications Missing 3) Safety of navigation - Nautical publications Expired 4) Safety of navigation - Charts Expired 5) Safety of navigation - Voyage or passage plan Missing 6) Life saving appliances - Lifebuoys incl provision and disposition Not as required 7) Emergency system - Emergency fire pump and its pipes Not properly maintained 8)) Emergency system - Emergency fire pump and its pipes Inoperative 9) Emergency system - Crew familiarization with emergency system Not as required 10) ISM - Ism certificate Not as required The vessel was released again on Oct 23 and left the port enroute to Mersin. The last detentions were on Jan 28, 2026, in Chalkis with 29 deficiencies for 69 days, on Sep 12, 2025 in Burgas with 15 deficiencies for 14 days, on June 19, 2025, in Yalova with ten deficiencies for five days and on May 28, 2025, in Gemlik with 33 deficiencies for eight days. https://www.facebook.com/share/p/1JZDU9tWm6/

Ship banned from Paris- MOU ports after fourth detention

Sun Apr 26 20:53:50 CEST 2026 Timsen

The "Dieva" was detained for the fourth time within ten months on Jan 28, 2026, this time in Chalkis with 29 deficiencies, 18 of which being regarded as seriously and grounds for a detention: 1) Safety of navigation - BNWAS Inoperative 2) Fire safety - Fixed fire exthinguishing installation Inoperative 3) Fire safety - Fire fighting equipment and appliances Not as required 4) Fire safety - Maintenance of Fire protection system Not as required 5) Fire safety - Fire dampers Inoperative 6) Fire safety - Evaluation of crew performance Lack of training 7) Labour conditions - Non-payment of wages Non payment 8)) Labour conditions - Galley, handlingroom (Maintenance) Not as required 9) Labour conditions - Mooring Ropes/Lines and Wires Not as required 10) Labour conditions - Electrical Unsafe 11) Labour conditions - Guards, fencing around dangerous machinery parts Not as required 12) Labour conditions - Heating, air conditioning and ventilation Inoperative 13) Alarms - Machinery controls alarm Inoperative 14) Radio communications - Operation/Maintenance Not as required 15) Propulsion and auxiliary machinery - Other (Machinery) Other 16) Emergency system - Muster list Missing 17) Emergency system - Emergency lighting, batteries and switches Inoperative 18) ISM - Ism certificate Not as required The vessel was released again only on April 6, and the inspection led to a refusal of access to Paris MOU harbours. On April 20, a Port State Control in Mersin found 15 deficiencies. The last detentions were on Sep 12, 2025, in Burgas with 15 deficiencies for 14 days, on June 19, 2025, in Yalova with ten deficiencies for five days and on May 28, 2025, in Gemlik with not less than 33 deficiencies for eight days. https://www.facebook.com/share/p/17AGc8xgzK/

Third detention within a few months

Sat Sep 27 22:31:39 CEST 2025 Timsen

The "Dieva" was detained for the third time within four months on Sep 12, this time in Burgas, Bulgaria with 15 deficiencies, eight of which being regarded as seriously and grounds for a detention: 1) Certificate & Doc - Continuous Synopsis Record Missing 2) Labour conditions - Non payment of Wages Non payment of wages 3) Emergency systems - Emergency source of power - emergency generator Inoperative 4) Water/Weathertight - Ventilators, air pipes and casings Not properly maintained 5) Water/Weathertight - Doors Not properly maintained 6) Safety of navigation - Charts Expired 7) Safety of navigation - Compass correction log Missing 8)) ISM - Ism certificate Not as required The vessel was released again on Sep 25 and shifted to Burgas Anchorage. As of Sep 27, it remained stationary in pos. 42° 28' N 027° 30' E. The last detentions were on June 19 in Yalova with ten deficiencies for six days and on May 28 in Gemlik with 33 deficiencies for eight days. https://www.facebook.com/share/p/15yMFFgrpp/

News schreiben

Ship master data