Allgemeine Informationen

IMO:
9371579
MMSI:
245554000
Rufzeichen:
PHPU
Breite:
27.0 m
Länge:
145.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Cargo Ship
Ship type:
Flagge:
Netherlands
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
8.0° / 0.0
Kompasskurs:
10.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moving
Gebiet:
Straits of Florida
Zuletzt empfangen::
2026-11-04
vor 3 Tagen
 
Source:
T-AIS
Von:
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 6 Tagen 
Source:
T-AIS

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Bitte anmelden, um die letzten port calls zu sehen

Log in

Die letzten Wegpunkte

Bitte anmelden, um die letzten wegpunkte zu sehen

Log in

Die neuesten Nachrichten

Jumbo Shipping delivers its largest ever container crane with Fairplayer

Sat Jun 25 08:02:14 CEST 2011 arnekiel

Weighing close to 1,200 tonnes and equipped with a transport boom of 104 m, it was the largest container crane ever transported by Jumbo and its arrival at the Port of Sète significantly increases the port's container handling capacity, HeavyLift reports. The project presented several technical challenges, which required innovative solutions. The crane's centre of gravity was located relatively high up and its base protruded by four metres off the hull of Jumbo's Fairplayer, which the designated vessel for this cargo. Engineers from Jumbo and Eurocrane developed a one-off solution which included adding ballast boxes which added ballast weight on a low elevation; decreased the supported width of the crane structure, which was partly overhanging; acted as load spreaders and outriggers for the lifting points. The crane was assembled in Aveiro (Portugal) and placed on board the Fairplayer in a single lift using its two 900-tonne mast cranes. The relatively high location of the centre of gravity meant the lift was a critical one: strong winds could cause the crane to incline. Therefore, pre-defined limits were described in the procedures. To ensure a smooth and controlled lift, the crane's stability was increased by adding ballast weight. More at http://www.heavyliftpfi.com/content/NewsItem.aspx?id=3005

News schreiben

Ship master data