Allgemeine Informationen

IMO:
9236133
MMSI:
209306000
Rufzeichen:
5BJV3
Breite:
24.0 m
Länge:
103.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Cargo Ship
Ship type:
Flagge:
Cyprus
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
0.0° / -128.0
Kompasskurs:
511.0° / -128.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
waiting
Gebiet:
Mediterranean Sea
Zuletzt empfangen::
2025-01-31
vor 647 Tagen
Source:
T-AIS
Von:
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 651 Tagen
Source:
T-AIS

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Bitte anmelden, um die letzten port calls zu sehen

Log in

Die letzten Wegpunkte

Bitte anmelden, um die letzten wegpunkte zu sehen

Log in

Die neuesten Nachrichten

Grounded ship removed and towed to Livorno

Fri Dec 19 10:27:39 CET 2025 Timsen

The company BlueTack from Heinenoord and their Italian partner Fratelli Neri have completed the salvage of the 'Guang Rong', which had run aground on Jan 28, en route to Genoa with a large load of rocks for work on the breakwater, after hitting the pier in Marina di Massa. Both the ship and the pier were severely damaged. The pier has been off-limits to residents since then. The ship was towed to Livorno on Dec 15, where it will be repaired and possibly sold. To refloat the ship, the rocks were first removed. In addition, significant work was put into making various compartments on the ship watertight and/or oil-tight. Some of the tanks were pumped or blown dry. The preparations for the salvage took months, partly because insurance matters still needed to be sorted out and a criminal investigation into the accident was still ongoing. During the summer, BlueTack and the local towing and salvage company Fratelli Neri were awarded the salvage contract by the authorities. For the reconstruction of part of the pier, the city was waiting for the Ministry to allocate funds. Report with photos: https://www.schuttevaer.nl/nieuws/actueel/2025/12/18/nederlands-bedrijf-bergt-vrachtschip-guang-rong-dat-jaar-geleden-in-italie-aan-de-grond-liep/

Shipowner expected to abandon ship - oil removal underway

Thu Mar 13 11:02:26 CET 2025 Timsen

The probabilioty that the 'Guang Rong' will be declared a 'wreck' by the shipowner is becoming increasingly concrete. The costs of removal would amount to over 1,5 million euros. A recovery would not be economically viable. The Municipality would then be forced to dialogue no longer with the owners, but with the insurance company, called upon to resolve the problem of disposing of the ship. On the morning of March 7, rumors took this decision by the shipowner for granted, but the mayor of Massa, Francesco Persiani, could not yet confirm this information. The emptying of the starboard side tank inside the sludge room was completed on the evening of March 6. The operations to empty the diesel and oil tanks of the wheel loader and the crane, also inside the sludge room, have also been completed. The latter will was sucked up on the morning of March 8. On March 7, a pontoon was positioned on the starboard side of the ship and after having secured the area, the operations to remove the oil drums located between the cargo and the coaming will begin. The operations to unload the material in drums onto the barge moored to the starboard side of the 'Guang Rong' have also started. The lateral cranes of the lifeboats and free fall have been cleaned, the recovered oils will be conveyed to the sludge room and sucked up by Canal jet. Reports with photos and video: https://www.lanazione.it/massa-carrara/cronaca/guang-rong-relitto-vhzu2vmn https://www.iltirreno.it/massa/cronaca/2025/03/08/news/marina-di-massa-la-guang-rong-rischia-di-diventare-un-relitto-1.100672988 https://www.noitv.it/2025/03/guang-rong-il-giallo-del-relitto-e-i-timori-per-lestate-651578/

Preparations for oil removal underway

Fri Feb 07 11:32:39 CET 2025 Timsen

On Feb 5 the Public Prosecutor's Office and the Port Authority have authorised an on-board inspection of the 'Guang Rong', which is necessary before emptying the tanks and preventing a possible environmental disaster, given that the ship is carrying around 102 tonnes of diesel fuel. The iInspections have begun to identify the access areas and allow the removal of fuel on board. The attention is focused on the port side of the vessel, both the emerged and submerged parts, to check the condition of the hull and speed up the transfer of fuel. The main tank has been reached and the diesel could be sucked out through the manhole. The pipes have already been prepared on the pier and the vehicles are ready to intervene. The urgency is also dictated by the worsening weather conditions forecast for the weekend. According to the Coast Guard, there were currently no fuel spills, thanks to the timely installation of floating ´absorbent booms. After the first inspection, a plan for pumping the fuel will be presented. The fate of the ship will then be decided: it could be recovered by the owner or, more likely, declared a wreck to be disposed of. The operations are constantly monitored by the Coast Guard, with the support of divers and law enforcement, under the coordination of Prefect Guido Aprea. Regarding the stability of the pier, the checks were underway. Inspections were carried out both above and below the structure. Astructural engineer was acquiring the necessary documentation. Load tests on the pier would be essential for the fuel extraction operations. Despite the situation actually being regarded as under control, the risk of spills remained high, especially in the event of worsening weather conditions. The Coast Guard has requested satellite images to monitor the environment and prevent ecological damage.. The intervention plan includes, once the fuel has been drained, the evaluation of the stability of the hull and the possibility of towing the ship to a safe area. If the shipowner decides not to recover the 'Guang Rong', and it would be disposed of in accordance with current regulations. Report with video: https://www.noitv.it/2025/02/proseguono-le-operazioni-per-la-gestione-della-guang-rong-incagliata-nel-porto-di-marina-di-massa-643948/

News schreiben

Ship master data