Allgemeine Informationen

IMO:
9155420
MMSI:
341968001
Rufzeichen:
V4MM6
Breite:
16.0 m
Länge:
100.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Cargo Ship
Ship type:
Flagge:
Saint Kitts and Nevis
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
53.2° / 0.0
Kompasskurs:
51.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moving
Gebiet:
Adriatic Sea
Zuletzt empfangen::
2026-11-07
vor 1 Tag
Source:
T-AIS
Von:
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 1 Tag
Source:
T-AIS

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Bitte anmelden, um die letzten port calls zu sehen

Log in

Die letzten Wegpunkte

Bitte anmelden, um die letzten wegpunkte zu sehen

Log in

Die neuesten Nachrichten

Detention in Aliaga

Mon Jun 08 23:31:25 CEST 2026 Timsen

On June 4, 2026, the ' Haya' was detained in Aliaga with 14 deficiencies, four of which being regarded as seriously and grounds for a detention: 1) Certificate & Doc - Other (Certificates) Other 2) Emergency system - Emergency source of power- emergency generator Not as required 3) Fire safety -Fire pumps and its pipes Inoperative 4) ISM - Ism certificate Not as required The vessel was released again on June 5 and left the port enroute to Gulluk, where it anchoredon June 7. https://www.facebook.com/share/p/1J7b2aTQuX/

Technical failure near Ayvalik

Tue May 07 21:03:16 CEST 2019 Timsen

The "Haya", sailing from Nemrut Bay, to Aliaga in ballast, suffered a technical failure and sheltered at Ayvalik anchorage under its own power on May 5. Repairs were still being carried out by the crew while the vessel was moored in pos. 39° 30.89' N 026° 53.77' E.

Engine trouble in Mycale Strait

Sun Nov 18 13:06:48 CET 2018 Timsen

The "Amira Amina", en route from Sidon to Tuzla, in ballast condition, suffered a technical failure during the passage of the Mycale Strait on Nov 17, 2018, at 5 a.m. The vessel dropped anchor at Karanlik Liman Anchorage. The repairs are being carried out by the crew before resuming the voyage to Tuzla. It arrived at Tuzla Shipyard on Nov 25 for permanent repairs with shore-based support, and left the port again on Jan 18, 2019, at 3.50 p.m., headed to Izmit where it berthed on Jan 19 at 3.30 p.m.

News schreiben

Ship master data