Allgemeine Informationen

IMO:
9376919
MMSI:
235053239
Rufzeichen:
MQPQ9
Breite:
14.0 m
Länge:
54.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Passenger ship
Ship type:
Flagge:
United Kingdom
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
239.6° / 0.0
Kompasskurs:
259.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
waiting
Gebiet:
Inner Seas
Zuletzt empfangen::
2026-10-31
vor 8 Tagen
Source:
T-AIS
Von:
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 11 Tagen
Source:
T-AIS

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Bitte anmelden, um die letzten port calls zu sehen

Log in

Die letzten Wegpunkte

Bitte anmelden, um die letzten wegpunkte zu sehen

Log in

Die neuesten Nachrichten

Ferry suffered fouled propulsion

Thu Sep 03 21:14:59 CEST 2026 Timsen

The 'Loch Shira', serving on the route Largs - Cumbrae, got its propeller foulled by an obstructio, and scheduled sailings had to be suspended. Affected were initially tge departures from Largs at 10:30, a.m. and 11:10 a.m., and the departures from Cumbrae at 10:50 a.m. and 11:30 a.m. Divers have been arranged to attend the vessel on the afternoon. The 'Loch Tarbert's sailings were operated as per timetable: https://calm.ac/07 After the object was successfully removed, the 'Loch Shira' returned to service with the 6:10 p.m. departure from Cumbrae.

Ferry suffered technical issue

Tue Aug 18 10:19:07 CEST 2026 Timsen

The 'Loch Shira', serving on the route Largs-Cumbrae, suffered a technical issue on Aug 16. As a consequence, the 10:40 a.m. sailing from Largs and the 11:00 a.m. sailing from Cumbrae had to be cancelled. The vessel resumed its service after troubleshooting with the 11:20 a.m. sailing from Largs.

Ferry suffered ramp issue

Wed Jul 01 23:08:28 CEST 2026 Timsen

The 'Loch Shira', serving on the route Largs - Cumbrae, suffered an issue with the ramp on July 2. As aconsequence, the vessel had to operate single ended. Some vehicles may be required to reverse on/off and turnarounds may be longer than scheduled. A further update was to be provided on the morning of July 2.

News schreiben

Ship master data