MV ULLA
Kurs/Position
vor 4 Min
Die letzten Häfen

Die letzten Wegpunkte

Die neuesten Nachrichten
Detention in Klaipeda
On April 3, 2026, the 'Ulla' was detained in Klaipeda with 14 deficiencies, seven of which being regarded as seriously and grounds for a detention: 1) Alarms - UMS - Alarms Inoperative 2) Fire safety - Fire doors/openings in fire resisting division Not as required 3) Fire safety - Jacketed high pressure lines and oil leakage alarm Not as required 4) Propulsion and auxiliary machinery - Auxiliary machinery Not as required 5) Safety of navigation - Record of drills and steering gear tests Not as required 6) Pollution Prevention - Oil filtering equipment Not as required 7) ISM - Ism certificate Not as required The vessel was released agqin on April 16 and left the port enroute to Oslo with an ETA as of April 21. https://www.facebook.com/share/1FgJqwn8xH/
News schreiben

