NINA
Die letzten Häfen

Die letzten Wegpunkte

Die neuesten Nachrichten
Detention in Volos
On Aug 11, 2026, the 'Nina' was detained in Volos with three deficiencies, all of which being regarded as seriously and grounds for a detention: 1) Emergency system - Emergency fire pump and its pipes Not as required 2) Emergency system - Fire drills Lack of training 3) ISM - Ism certificate Not as required The vessel was released again on Aug 13 and left the port enroute to Constanta with an ETA as of Aug 16. https://www.facebook.com/share/p/1DJhmxEiic/
Propeller damage repaired after taking on 1500 tons ballast water
Coming from Klaipeda, the master of the "Monte" remarked a propeller problem underway to Lübeck. As no dock space is available in this port, once the ship berthed on OCt 18, 2014, the ballast tanks were filled with 1500 tons water to get access to the propulsion gear above the water. It was found out that the propeller had suffered corrosion damage. The works were completed on Oct 23 so far that the ship headed for the Severnaya Verf Shipyard in St. Petersburg, where it berthed on Oct 29. German report with photo: http://www.ln-online.de/Lokales/Luebeck/Ungewoehnliche-Schraeglage-Schiff-mit-Heck-in-der-Luft
News schreiben

