Allgemeine Informationen

IMO:
7618026
MMSI:
Rufzeichen:
LEHT
Breite:
9.0 m
Länge:
55.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Fishing Boat
Ship type:
Flagge:
Norway
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
360.0° / -128.0
Kompasskurs:
511.0° / -128.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moving
Gebiet:
Antarctica
Zuletzt empfangen::
2024-03-24
vor 960 Tagen
Source:
T-AIS
Von:
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 960 Tagen
Source:
T-AIS

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Bitte anmelden, um die letzten port calls zu sehen

Log in

Die letzten Wegpunkte

Bitte anmelden, um die letzten wegpunkte zu sehen

Log in

Die neuesten Nachrichten

arrived Fosen Scrapyard

Sun Oct 06 11:15:19 CEST 2024 BerndU

March 2024 : https://fosengjenvinning.no/product/2024-mars-salaroy-ankommet-for-gjenvinning-wartsilla-6r32e-3345-hp/

Ship detained for 31 defiencies and social dumping

Thu Nov 22 12:12:45 CET 2018 Timsen

The Norwegian Maritime Directorate detained the "Ottar" in Sogn og Fjordane due to a number of defiencies found during an inspection aboard the ship in Måløy, both on Nov 20 and 21, 2018, after its arrival in port, coming from Lødingen, at 5.50 p.m. The police, the Norwegian Maritime Directorate and the Norwegian Seamen's Association have been on board to map the facts about the ship and the wages the crew, including two Philippine engineers. The list comprised 31 points, several of which were considered to be serious. The ship was overloaded and had a number of technical failures. In addition, relationships in contracts and formalities were not at stake. There was evidence that the two Philippine engineers, who were contracted in Tromsø in August, have 1,000 dollars in salary (under 9,000 Norwegian Crowns) which was far from the Norwegian engineer's minimum wage so that they already owed eight monthly wages from the shipping company. The ship was arrested until the deficiencies have been corrected. The company Havsula Invest AS received a list of the shortcomings on board. Norwegian report with photos: https://fiskeribladet.no/nyheter/?artikkel=63703

News schreiben

Ship master data