SCORPION 1
Die letzten Häfen

Die letzten Wegpunkte

Die neuesten Nachrichten
Second detention within a few months
The "Scorpion I" was detained for the second time within less than half a year on Aug 13, 2026, this time in Ravenna, Italy with 18 deficiencies, seven of which being regarded as seriously and grounds for a detention: 1) Certificate & Doc - Maximum hours of work or minimum hours or rest Not as required 2) Certificate & Doc - Cargo Ship Safety equipment Not properly filled 3) Labour conditions - Wages Non payment of wages 4) Fire safety - Fixed fire exthinguishing installation Not as required 5) Fire safety - Personal equipment for fire safety Not as required 6) Safety of navigation - Signalling lamp Inoperative 7) ISM - Ism certificate Not as required The vessel was released again on Aug 17 and left the port enroute to Rijeka, where it arrived onAug 18. The last detention was on April 2 in Rasa with ten deficiencies for 15 days. https://www.facebook.com/share/p/1EkuJdp4eL/
Detention in Rasa
On April 2, 2026, the "Scorpion I" was detained in Rasa with ten deficiencies, six of which being regarded as seriously and grounds for a detention: 1) Certificate & Doc - Manning specified by the minimum safe manning doc Missing 2) Certificate & Doc - Endorsement by flagstate Missing 3) Certificate & Doc - Shipboard working arrangements Not properly filled 4) Certificate & Doc - Certificate for rating or watchkeeping Missing 5) Safety of navigation - Charts Not updated 6) Emergency system - Fire drills Lack of knowledge The vessel was released again on April 13 and left the port enroute to Damietta with an ETA as of April 20. https://www.facebook.com/share/1bnNJvTSLK/
Charter
5 - 6 months traiding Mediterranean, Sermar
News schreiben

