Allgemeine Informationen

IMO:
8721519
MMSI:
372920000
Rufzeichen:
3FII
Breite:
13.0 m
Länge:
116.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Cargo Ship
Ship type:
Flagge:
Panama
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Anchored
Kurs:
62.6° / 0.0
Kompasskurs:
60.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moving
Gebiet:
Black Sea
Zuletzt empfangen::
2026-09-17
vor 52 Tagen
Source:
T-AIS
Von:
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 52 Tagen
Source:
T-AIS

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Bitte anmelden, um die letzten port calls zu sehen

Log in

Die letzten Wegpunkte

Bitte anmelden, um die letzten wegpunkte zu sehen

Log in

Die neuesten Nachrichten

Second detention in 2026

Wed Nov 04 11:02:34 CET 2026 Timsen

The 'Shelekhov' was detained for the second time within little more than a month, this time on Oct 21 in Trabzon with 14 deficiencies 1) Certificate & Doc - Documents of compliance Not as required 2) Certificate & Doc - Signs and inducations Not as required 3) Pollution Prevention - Oil and oily mixture from machinery spaces Not as required 4) Pollution Prevention - Ballast Water Not as required 5) Pollution Prevention - Other (Marpol Annex I) Other 6) Emergency system - Fire drills Lack of training 7) Radio communications - MF / HF Radio installations Not as required 8)) Life saving appliances - Inflatable liferafts Not as required 9) Life saving appliances - Lifeboats Not ready for use 10) Fire safety - Fire doors/openings in fire resisting division Not as required 11) Living and working - Ropes and wires Not as required 12) Structural conditions - Decks - corrosion Corroded 13) Structural conditions - Other (structural conditions Other 14) ISM - Ism certificate Not as required The vessel was released again on Nov 2. The last detentions were on Sep 5 in Tuapse with ten deficiencies for six days and on Jan 24, 2025 in Karasu with 22 deficiencies, for five days. https://www.facebook.com/share/p/17uqj6JoZb/

Detention in Tuapse

Sun Sep 13 12:13:06 CEST 2026 Timsen

The 'Shelekhov' was detained in Tuapse on Sep 5, 2026, with three detainable deficiencies: 1331 - Certificate and Documentation - Documents - Collective bargaining agreement - no responsibility of RO; 15150 - ISM - ISM - no responsibility of RO; 18203 - Labour Conditions-Conditions of employment - Wages - no responsibility of RO. The ship was released again on Sep 9. The last detention was on Jan 24, 2025, in Karasu with 22 deficiencies for four days.

Detention in Karasu

Sat Feb 01 13:55:28 CET 2025 Timsen

On Jan 24, 2025, the 'Shelekov' was detained in Karasu with 22 deficiencies, 19 of which being regarded as seriously and grounds for a detention: 1) Certificate & Doc - Cargo Ship Safety Construction (incl exemption) Not as required 2) Certificate & Doc - International Oil Pollution Prevention Cert Missing 3) Certificate & Doc - International Sewage Pollution Prevention Cert Missing 4) Certificate & Doc - Log-books/compulsory Entries missing 5) Certificate & Doc - Other (Certificates) Other 6) Life saving Appliances - Lifeboats Not properly maintained 7) Living and working - Pipes, wires (insulation)' Not as required 8)) Living and working - Lighting (Accommodation) Not as required 9) Living and working - Accident prevention Not as required 10) Living and working - Other (Working spaces) Not as required 11) Pollution Prevention - Oil and oily mixtures form machinery spaces Not as required 12) Pollution Prevention - Other (Marpol Annex I) Other 13) Propulsion and auxiliary machinery - Auxiliary machinery Not as required 14) Propulsion and auxiliary machinery - Other (Machinery) Other 15) Structural conditions - Hull - Corrosion Corroded 16) Structural conditions - Decks - Corrosion Corroded 17) Structural conditions - Ballast, fuel and other tanks Not as required 18) Structural conditions - Closing devices/watertight doors Damaged 19) Radio communications - Other (Radio communications) Other The vessel was released again on Jan 28 and left Istanbul for orders. https://www.facebook.com/profile.php?id=100063576908591

News schreiben

Ship master data