Allgemeine Informationen

IMO:
9213894
MMSI:
314001074
Rufzeichen:
8PZP9
Breite:
15.0 m
Länge:
112.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Cargo Ship
Ship type:
Flagge:
Barbados
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
254.0° / 0.0
Kompasskurs:
254.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moving
Gebiet:
English Channel
Zuletzt empfangen::
2026-11-05
vor 3 Tagen
Source:
T-AIS
Von:
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 3 Tagen
Source:
T-AIS

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Bitte anmelden, um die letzten port calls zu sehen

Log in

Die letzten Wegpunkte

Bitte anmelden, um die letzten wegpunkte zu sehen

Log in

Die neuesten Nachrichten

Re-opening of destroyed bridge further pushed back

Tue Nov 04 09:28:13 CET 2025 Timsen

The DB InfraGO has had to postpone the commissioning of the Wunderline between Groningen, Leer, and Bremen, which is important both regionally and as a vital link in pan-European rail traffic from Amsterdam to Hamburg and Scandinavia. until mid-2026. The start of cross-border train service on the Groningen-Leer route was most recently planned for the timetable change in December 2025. The re-opening of the Friesen Bridge in Weener, which had to be reconstructed after the allision fhe 'Emsmoon', actually sailing as 'Stolya', in December 2015, was faceing further obstacles. There were also technical challenges in connecting the existing signaling technology in Papenburg to the new electronic interlocking system in Ihrhove, so that the rail company Arriva could not yet begin the necessary, extensive training and test runs. Only after this will scheduled service on the Wunderline be possible, currently planned for summer 2026. The replacement bus service will continue unchanged until then. The pedestrian walkway across the bridge is open daily from 7 a.m. to 5 p.m., but not during high tide.

Man fell into cargo hold

Tue Nov 04 09:21:43 CET 2025 Timsen

The emergency services were deployed in the morning of Sep 20, 2022, to the 'Helas', which had been berthed in the port of Harlingen for repair works since Aug 4. A man had fallen into a cargo hold. The seriously injured victim was lifted from the hold using a crane. The fire brigade was able to return to the station almost immediately. The ambulance personnel received support from the Mobile Medical Team of Eelde.

Emsmoon left Papenburg

Mon Dec 14 09:39:44 CET 2015 Timsen

The "Emsmoon“ left the port of Papenburg again after the wreckage of the Friesen Bridge at Weener was removed by the sheerlegt "Triton" and the fairway cleared for any traffic. The ship still bearing the scars of the allision shifted from the North port to the South port on Dec 12 and finally left the port on Dec 13 at 2.20 a.m. and headed for Södertalje, ETA Dec 15, 9 p.m. Photos: http://forum-schiff.de/phpBB3/viewtopic.php?f=9&t=6087#p121237 http://forum-schiff.de/phpBB3/viewtopic.php?f=9&t=6087#p121215

News schreiben

Ship master data