Allgemeine Informationen

IMO:
8770314
MMSI:
636018352
Rufzeichen:
D5PI7
Breite:
89.0 m
Länge:
116.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Other Ship
Ship type:
Flagge:
Liberia
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
57.0° / 0.0
Kompasskurs:
64.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moving
Gebiet:
Alboran Sea
Zuletzt empfangen::
2026-08-08
vor 92 Tagen
Source:
T-AIS
Von:
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 342 Tagen
Source:
T-AIS

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Bitte anmelden, um die letzten port calls zu sehen

Log in

Die letzten Wegpunkte

Bitte anmelden, um die letzten wegpunkte zu sehen

Log in

Die neuesten Nachrichten

sold to Breakers

Mon May 25 12:18:19 CEST 2026 BerndU

Sold to Breakers 15.05.26

Rig went adrift in cyclone

Mon Mar 16 10:49:58 CET 2015 Timsen

The "Atwood Osprey" snapped several of its 12 mooring lines in the evening of Mar 12, 2015, about 180 km north-west of Dampier during wild weather caused by the cyclone Olwyn. The crew was evacuated and the rig ballasted down in line with standard pre-cyclone demobilisation procedures. The rig was on location to complete the Iago 1B well but had been disconnected as part of the demobilisation. As the fallout from the drifting drill rig contracted to Chevron has spread to the "Pluto" of Woodside Petroleum which has shut down its production. The measure was precautionary and temporary while the drifting semi-submersible drill rig "Atwood Osprey" was secured away from the infrastructure. The rig had drifted about three nautical miles, dragging its mooring lines and anchors with it. Underwater inspections of the "Pluto" flowlines were carried out, and production was due to restartwhen the rig has been relocated away from the "Pluto" infrastructure. Chevron and Osprey owner Atwood Oceanics were assessing the extent of damage to the rig and to Wheatstone infrastructure. The "Atwood Osprey" was stabilized with a support vessel in position. Though there seemed to be only minimal damage to the rig, repairs were expected to take up to 30 days. T Chevron and Atwood sent work boats to the "Atwood Osprey" and were working with Woodside to move the rig to a secure location.

News schreiben

Ship master data