VENTURA
Kurs/Position
vor 3 Min
Die letzten Häfen

Die letzten Wegpunkte

Die neuesten Nachrichten
Second detention in 2026
The "Ventura" was detained for the second time in little more tgan a half year, this time on Sep 3 in Setubal with 11 deficiencies, three of which being regarded as seriously and grounds for a detention: 1) Certificate & Doc - International Oil Pollution Prevention Invalid 2) Pollution Prevention - Oil filtering equipment Inoperative 3) Propulsion and auxiliary machinery - UMS - Ship Inoperative The vessel was released again on Sep 14. The last detention was on Feb 18 in Gdynia with 23 deficiencies for 11 days. https://www.facebook.com/share/p/1WAY9ijyVQ/
Detention in Gdynia
The "Ventura" was detained in Gdynia following its arrival on Feb 18, 2016, after an inspection found eight deficiencies: 1) Radio communications - Facilities for reception of marine safety inform Inoperative 2) Fire safety - Fixed fire exthinuishing installation Inoperative 3) Fire safety - Jacketed high pressure and oil leakage alarm -Missing 4) Fire safety - Fire detection and alarm system Inoperative 5) Pollution Prevention - Sewage treatment plant' Not as required 6) Propulsion and auxiliary mach. - Auxiliary machinery Insufficient power 7) Propulsion and auxiliary machiner - UMS . Ship Inoperative 8) Safety of navigation - Navigation bridge visibility Not as required The vessel was released again on Feb 28 and left the port enroute to Fredrikstad with an ETA as of March 3. https://www.facebook.com/share/p/1CHvCY2CCd/
Double trouble in Vigo
The "Ventura" remained at Vigo due to an engine fault, which occurred on its voyage from Aveiro to Szczecin, since Jan 20, 2019. The vessel attempted to sail again on Jan 27, but again encountered engine problems and required assistance of the salvage tug "Maria Pita" and berthed at 3.55 p.m.
News schreiben

