General information

IMO:
9733117
MMSI:
249010000
Callsign:
9HA6061
Width:
52.0 m
Length:
335.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Passenger ship
Ship type:
Flag:
Malta
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
134.2° / 0.0
Heading:
135.0° / 0.0
Speed:
Max speed:
Status:
moving
Area:
Sea of Crete
Last seen:
2026-11-08
3 hours ago
 
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
3 hours ago 
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Please log in to see latest port calls

Log in

Latest Waypoints

Please log in to see latest waypoints

Log in

Latest news

Cruise ships resuming their schedules in May

Tue Apr 21 10:39:59 CEST 2026 Timsen

On May 15, the 'Mein Schiff 5' will begin its summer season in the Eastern Mediterranean from Heraklion. On May 17, the 'Mein Schiff 4'Ä will commence operations in Trieste,, where it will be based for Adriatic cruises. Given that the voyage south around Africa takes over three weeks and also requires logistical stops, the schedule for the two TUI Cruises ships was relatively tight. The 'MSC Euribia', operated by MSC Cruises, still has a long journey ahead before it begins operations in Kiel on May 16. The ship will then start its summer season two weeks late, sailing a route to the Norwegian fjords from/to Kiel and Copenhagen. Celestyal Cruises was currently repositioning both its ships from the Middle East to the Mediterranean. Since they have switched off their AIS, it was impossible to determine whether the ships were being transferred through the Red Sea and the Suez Canal or south around Africa. The Suez Canal was last listed as the destination for the 'Celestyal Discovery', while the 'Celestyal Journey' appeared to be heading for Cape Town. All currently bookable voyages were to be operated. This would mean that the 'Celestyal Discovery' should commence operations on May 22, in Lavrion, and the 'Celestyal Journey' on May 23 in Piraeus. The last of the six cruise ships to leave the Persian Gulf was the 'Aroya,' operated by the Saudi cruise line Aroya Cruises. It was expected to arrive in Jeddah on April 27,. Before that, the ship faces another challenging passage along the Yemeni coast. If all goes according to plan, the 'Aroya' will welcome its next guests in the port of Jeddah on May 14,. Cruise ship launch dates at a glance: - May 14, 2026: Aroya (Aroya Cruises) in Jeddah; - May 15, 2026: Mein Schiff 5 (TUI Cruises) in Heraklion; - May 16, 2026: MSC Euribia (MSC Cruises) in Kiel; - May 17, 2026: Mein Schiff 4 (TUI Cruises) in Trieste; - May 22, 2026: Celestyal Discovery in Lavrion/Athens; - May 23, 2026: Celestyal Journey in Piraeus/Athens.

Last cruise ship passed Strait of Hormuz

Mon Apr 20 11:50:55 CEST 2026 Timsen

After the 'Celestyal Discovery', 'Celestyal Journey', 'MSC Euribia', 'Mein Schiff 5', and 'Mein Schiff 4' passed through the Strait of Hormuz since April 17, thus leaving the Persian Gulf, the 'Aroya' from Aroya Cruises has now also sailed through the strait – despite the ongoing closure of the waterway. It did not join the other cruise ships but left its berth on April 18, at approximately 6:00 p.m. MSC Cruises, Celestyal Cruises, and Mein Schiff had already announced that their ships had completed the passage. The passage was officially closed again at noon. Nevertheless, the 'Aroya also made its way. With this action, all the cruise ships that had been stuck in the Persian Gulf for weeks were now en route to their summer cruising areas, which they will all reach too late. All of the ships have had to cancel their scheduled voyages. Since its departure, the 'Aroya' has indicated Fujairah as its destination in its AIS. It was expected to arrive there on April 20.

Cruise ship not among those speeding through Strait of Hormuz

Sat Apr 18 15:05:52 CEST 2026 Timsen

Following the successful passage of the Strait of Hormuz of the 'Celestyal Discovery' on April 17, four more cruise ships set sail. The 'Celestyal Journey' and 'Mein Schiff 5' departed Doha, the 'Mein Schiff 4' left Abu Dhabi, and the 'MSC Euribia' sailed from Dubai. Only the 'Aroya', which sailed from Dubai to Dammam at the end of March, has not yet moved. Currently, the 'Celestyal Journey', 'MSC Euribia', 'Mein Schiff 4' and 'Mein Schiff 5' were sailing at high speed towards Khasab. The city lies directly on the Strait of Hormuz, which is sometimes blocked by Iran. Only the 'Celestyal Discovery' was able to benefit from the initial opening following a ceasefire. On the morning of April 18, Iran closed the Strait of Hormuz again. What this means for the four cruise ships at sea will soon become clear. Presumably, the ships are heading to Khasab Bay to leave the Middle East at the earliest opportunity. Given the rapidly evolving situation, positioning the cruise ships directly at the Strait of Hormuz seems sensible. For safety reasons, only a minimal crew is on board each ship to navigate out of the Persian Gulf. If this is successful within the next few hours or days, it will likely be another four weeks before cruise operations resume in Europe. TUI Cruises and MSC Cruises have canceled all sailings of the three affected ships until mid-May 2026. At 1.45 p.m., the four cruise ships have indeed entered the Strait of Hormuz. Like the 'Celestyal Discovery' the previous day, their course was taking them close to the Omani coast. The ships have indicated Muscat as their next destination. The critical part of the passage should be completed within the next few hours. The shipping companies will then decide on the next steps for the journey to Europe. They will either travel directly through the Red Sea and the Suez Canal or choose the somewhat safer, but longer, route south around Africa.

Upload News

Ship master data