General information

IMO:
9763837
MMSI:
563203700
Callsign:
9V9100
Width:
43.0 m
Length:
206.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Singapore
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
241.5° / 0.0
Heading:
212.0° / 0.0
Speed:
Max speed:
Status:
moored
Area:
China
Last seen:
2026-11-08
1 min ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
26 min ago
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Please log in to see latest port calls

Log in

Latest Waypoints

Please log in to see latest waypoints

Log in

Latest news

EU delisted ship from sanctions

Thu Oct 30 10:27:34 CET 2025 Timsen

In a surprise move the EU has delisted the 'Audax' and 'Pugnax', two polar class heavy lift vessels, The vessels were purpose-built for the construction of Russia’s Yamal LNG project in 2016. They also carried the majority of prefabricated modules for the country’s other flagship LNG project, Arctic LNG 2. The two ships, owned by also sanctioned Red Box Energy Services Pte. Ltd., could travel the Arctic Northern Sea Route even during the winter months. They continued working for Russia even in the face of Western sanctions. Both vessels completed shipments of modules just prior to the full-scale invasion of Ukraine by Russia in February 2022, and subsequently continued transporting modules to the Belolamenka Shipyard near Murmansk with the final delivery coming in January 2024. Red Box’s CEO at the time asserted his firm was only delivering steel structures, and that it had no contractual relations with Russia or Novatek. However, U.S. and EU officials were unconvinced, and both the companyand its vessels were sanctioned in May and June 2024. Red Box’s CEO Philip Adkins subsequently left the company in June 2024, after his Singaporean residence permit didn’t get extended. Since being sanctioned the vesseks have been largely idle with the former in coastal waters of the Yellow Sea and the latter docked in Singapore. In July 2025 the EU had lifted measures on the three MOL-controlled LNG carriers 'North Moon', 'North Ocean' and 'North Light', after receiving assurance that they would not be employed to transport Russian LNG. It was unclear if Red Box now offered similar guarantees. An unrecorded sale to a new owner could also explain the lifting of sanctions. With their PC3 ice-class the vessels are ideally suited for operation in polar waters, including in Antarctica. Currently, the 'Audax' and 'Pugnax' remained sanctioned by the U.S., Canada, and Switzerland.

First ever mid-winter transit of a module carrier on the Northern Sea Route

Mon Jan 02 09:19:30 CET 2017 arnekiel

ZPMC RedBox Energy Services believes the current sailing of its vessel AUDAX from the Bering Straits to Sabetta on Russia's Yamal Peninsula is the first ever mid-winter transit of a module carrier on the Northern Sea Route. The company's chief executive officer, Philip Adkins claims: "No one has ever delivered modules of this size in the middle of winter from Qingdao to Sabetta via the Northern Sea Route. "It is slow-going and the ambient temperature is -25 C. "We have invested a lot over the last two years in the training and preparation of our crews for this type of voyage. I am really proud of them." AUDAX is scheduled to arrive in Sabetta on the January 4, 2017 depending on the ice conditions. According to Adkins, the RedBox fleet of four specialist marine heavy lift ships represents the largest commitment of vessels from one owner handling the huge infrastructure modules that are being shipped to Russia in order to bring the vast Yamal LNG project on stream. The company's 50,000 dwt semi-submersibles, RED ZED I and RED ZED II, became the first vessels to transport prefabricated building structures for Yamal LNG in summer 2015.RedBox claims NSR first As weather conditions in the Russian Arctic started to deteriorate and ice limited sailing opportunities, Redbox's two ice-class ARC7 28,500 dwt PC-3 module carriers have come into their own. The two ships, each of which have ice-breaking capabilities, are capable of navigating year round above the Arctic Circle and will continue to be deployed to carry modules from Asia on to Sabetta, helping Technip to keep the construction project on schedule, says Adkins. SOURCE: HLPFI

Upload News

Ship master data