General information

IMO:
8001024
MMSI:
256038000
Callsign:
9HJE8
Width:
20.0 m
Length:
117.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Malta
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
191.8° / -128.0
Heading:
511.0° / -128.0
Speed:
Max speed:
Status:
waiting
Area:
Turkey
Last seen:
2025-11-10
363 days ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
363 days ago
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Please log in to see latest port calls

Log in

Latest Waypoints

Please log in to see latest waypoints

Log in

Latest news

beached

Sat May 17 11:07:19 CEST 2025 BerndU

Beached at Aliaga 16.05.25

Allision in Bützfleth

Mon Apr 06 19:01:33 CEST 2020 Timsen

On April 6, 2020, at 1.15 a.m. the 'CSL Elbe', upon its arrival from Rafnes in loaden condition, allided with the pier of the North Port in Stade-Bützfleth. The ship was running astern to get to its berth under conduct of a pilot. The ship had assistance tugs at bow and stern. But during the berthing manoever the ship hit the pier which suffered damage as well as the port side stern of the bulkcarrier. The water police Stade launched an investigation, and the ship was detained after berthing. At 6.30 p.m. it left the port again and headed to Jossingfjord with an ETA as of April 8. German report with photo: https://www.presseportal.de/blaulicht/pm/119277/4565749

Fuel pipe ruptured and disabled CSL Elbe

Mon May 23 21:58:10 CEST 2011 Timsen

In the night of Mar 23, 2011, at 1 a.m. the "CSL Elbe" was disabled after a fuel pipe ruptured just south of the bridge in Nærøy Strait outside Rørvik. The pilot on board required towing assistance after the ship had to stop the main engine due to the danger of fire in the engine room. The "CSL Elbe" was loaded with 9000 tons of limestone from Lessremman and heading south to Elnesvågen. The rescue boat "Harald V" and the coastguard vessel "Njord" were alarmed. The rescue boat managed to hold the "CSL Elbe" in position until by 2 a.m. and move it to open waters until the problems were fixed around 4.30 a.m. The CG vessel "Njord" was in stand-by position until the ship was clear to proceed and dropped the pilot at Grimma l/h. The rescue boat suffered some damage at the starboard stern during the dramatic rescue operation. Norwegian report with photo: http://www.nssr.no/Forside/Oljes%C3%B8l+forhindret.129352.cms

Upload News

Ship master data