General information

IMO:
8008101
MMSI:
Callsign:
D6A3386
Width:
15.0 m
Length:
82.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Comoros
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Anchored
Course:
164.4° / 0.0
Heading:
165.0° / 0.0
Speed:
Max speed:
Status:
moving
Area:
Aegean Sea
Last seen:
2025-07-25
472 days ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
472 days ago
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Please log in to see latest port calls

Log in

Latest Waypoints

Please log in to see latest waypoints

Log in

Latest news

Beached

Fri Jul 25 23:38:44 CEST 2025 BerndU

Beached at Aliaga 25.07.25

Cargo ship detained again

Mon Feb 10 13:17:34 CET 2025 Timsen

On Jan 30, 2025, the 'Emona' was detained in Gemlik with 38 deficiencies, 21 of which being regarded as seriously and grounds for a detention: 1) Certificate & Doc - Safety Management Certificate Missing 2) Certificate & Doc - Minimum Safe Manning Doc Missing 3) Certificate & Doc - Tonnage certificate Missing 4) Certificate & Doc - Other (certificate) Other 5) Structural conditions - Closing devices/watertight doors Damaged 6) Structural conditions - Ballast, fuel and other tanks Holed 7) Structural conditions - Other (Structural) Other 8)) Life saving Appliances - Inflatable liferafts Not ready for use 9) Life saving Appliances - Buoyant apparatus Insufficient 10) Life saving Appliances - Rescue boats inventory Missing 11) Water/Weathertight - Doors Damaged 12) Water/Weathertight - Ventilators, air pipes and casings Damaged 13) Fire safety - Fire detection and alarm system Inoperative 14) Fire safety - Other (Fire safety) Other 15) Living and working - Personal equipment Missing equipment 16) Emergency systems - Abandon ship drills Insufficient frequency 17) Emergency systems - Enclosed space entry and rescue drills No records 18) Pollution Prevention - Sewage discharge connection Not as required 19) Propulsion and auxiliary machinery - Bilge pumping arrangements Not as required 20) Radio communications - Other (Radio comm) Other 21) ISM - Other (ISM) Other The vessel was released again on Feb 4 and permitted a single voyage to the Tuzla shipyard area for permanent repairs. The last detentions were on Oct 22, 2024, in Karadeniz Eregli with 13 deficiencies for three days and on Sep 14, 2023, in Kocaeli with 20 deficiencies also for three days. https://www.facebook.com/profile.php?id=100063576908591

Upload News

Ship master data