General information

IMO:
MMSI:
211794580
Callsign:
DF2900
Width:
12.0 m
Length:
28.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Dredger
Ship type:
Flag:
Germany
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
240.2° / -128.0
Heading:
511.0° / -128.0
Speed:
Max speed:
Status:
moored
Area:
North Europe
Last seen:
2023-04-05
1313 days ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
1313 days ago
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Please log in to see latest port calls

Log in

Latest Waypoints

Please log in to see latest waypoints

Log in

Latest news

Crane boom segments detached in Barth

Wed Apr 16 11:52:41 CEST 2025 Timsen

The two upper segments of the crane boom of the 'Ferdinand' became detached on April 10, 2025, in the port of Barth. Using their own resources, the employees of the Ueckermünde-based hydraulic engineering company Colcrete managed to repair the defective crane, The damaged second-to-last segment was removed, and the upper end piece was reattached to the remaining boom. Although this shortened the boom somewhat, the reach was sufficient for the remaining sheet piles of the construction of the new marina. allowing to pull the remaining steel piles of the sheet pile barrier by the afternoon of April 14. To make things worse, the barge "Roock 84," which was alongside and was supposed to transport the 15-meter-long, two-ton sheet piles, sank on April 12. The loaded sheet piles were recovered and have been stored on the crane platform. The sunken barge was brought back to the surface on April 15. A small leak above the normal waterline led to the sinking. As it was continuously loaded with sheet piles, the barge sank deeper until the leak was below the water surface, so that the barge filled up with water in the access channel to the new Barth marina, which had recently been dredged to a depth of three meters. The barge was then completely unloaded and pumped dry. Because the leak was now above the water surface again, there was no danger as long as the barge is not moved. The dredging of the remaining sand barrier was scheduled to continue on April 22. Reports with photos: https://www.ostsee-zeitung.de/lokales/vorpommern-ruegen/ribnitz-damgarten/barth-pannen-bei-arbeiten-am-neuen-yachthafen-kran-kaputt-und-schiff-gesunken-QK3LTZCQ5RFTBFFVTVGL2IAWMM.html https://www.ostsee-zeitung.de/lokales/vorpommern-ruegen/ribnitz-damgarten/gesunkenes-arbeitsschiff-im-barther-yachthafen-gehoben-zufahrt-nach-ostern-frei-DYFYV6TWZVELXONFQ6DRB7HRVU.html

Upload News

Ship master data