General information

IMO:
9355604
MMSI:
636093460
Callsign:
D5JQ5
Width:
44.0 m
Length:
284.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Tankship
Ship type:
Flag:
Liberia
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Anchored
Course:
239.2° / 4.0
Heading:
239.0° / 4.0
Speed:
Max speed:
Status:
moving
Area:
Persian Gulf
Last seen:
2026-10-26
14 days ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
19 days ago
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Please log in to see latest port calls

Log in

Latest Waypoints

Please log in to see latest waypoints

Log in

Latest news

GasLog seals Panama FSU charter

Mon Sep 09 09:04:42 CEST 2019 arnekiel

Monaco-headquartered GasLog has sealed a ten-year time charter with Sinolam LNG Terminal for the provision of a LNG floating storage unit. The FSU will be used to receive, store and send out LNG to a gas-fired power project being developed in Panama. GasLog is planning the conversion of 155,000 cu m LNG carrier GasLog Singapore. The conversion will see the vessel become FSU ready, but also still be able to trade as an LNG carrier. The conversion is scheduled for the third quarter of 2020, at the same time as the vessel’s regular dry-docking. The charter in Panama will commence in November 2020.

First ship to berth at new LNG terminal in Pascagoula

Fri Jun 10 07:33:00 CEST 2011 arnekiel

El Paso's new liquefied natural gas terminal in Pascagoula will receive its first cargo on June 13 for testing purposes, the terminal operator told Reuters on Wednesday, Reuters reports.The Gaslog Singapore tanker, which can hold up to 155,000 cubic meters of LNG, set anchor near the newly built Gulf LNG terminal in Pascagoula on Wednesday and it will dock and offload next week. "It is expected to make berth on Monday June 13." The $1.1 billion Gulf LNG terminal will have the capacity to process up to 1.3 billion cubic feet (bcf) per day of LNG. Two on-site storage tanks have a combined capacity of up to 6.6 bcf. The LNG terminal comes online just as U.S. gas production hits record highs, which has dented import needs and left many new terminals in the U.S. Gulf sitting idle.

Upload News

Ship master data