General information

IMO:
9076404
MMSI:
Callsign:
C4SY2
Width:
27.0 m
Length:
164.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Cyprus
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
34.4° / 0.0
Heading:
24.0° / 0.0
Speed:
Max speed:
Status:
moving
Area:
Aegean Sea
Last seen:
2015-02-10
4289 days ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
4289 days ago
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Please log in to see latest port calls

Log in

Latest Waypoints

Please log in to see latest waypoints

Log in

Latest news

beached

Fri Mar 11 12:27:06 CET 2016 BerndU

Beache at Aliaga 02/2016 (Hull only)

Bulker refloated and towed to Salamis

Fri Jul 24 09:31:14 CEST 2015 Timsen

The "Goodfaith" could be removed from its grounding site in Andros after the accomodation block and parts of the stern were cut off to make the ship easier. On July 11, she was towed from Andros to Salamisby the "Christos XXII" and berthed at the Spanopoulos Group Salamis premises. It was thought she will be towed to Turkey in the near future in order to be demolished. The bulker had made the first voyage after having been drydocked when it went aground at Andros. Greek report and photos: http://www.arxipelagos.com/2015/07/%CF%83%CF%84%CE%B7-%CF%83%CE%B1%CE%BB%CE%B1%CE%BC%CE%AF%CE%BD%CE%B1-%CF%84%CE%BF-%CF%86%CE%BF%CF%81%CF%84%CE%B7%CE%B3%CF%8C-%CF%80%CE%BF%CF%85-%CF%80%CF%81%CE%BF%CF%83%CE%AC%CF%81%CE%B1%CE%BE%CE%B5/ http://www.shipspotting.com/gallery/photo.php?lid=2285154 http://www.shipspotting.com/gallery/photo.php?lid=2290441 http://www.shipspotting.com/gallery/photo.php?lid=2257792

Oil continues to be drained

Fri Mar 06 10:00:15 CET 2015 Timsen

The "Goodfaith" remained hard aground off northern Andros. Until Feb 27 about 190 cubic meters of oil from on the whole 300 cbm were drained with the help of the tug "Aegis I" which moored at the port side of the bulker. It was estimated that the entire process would last one week. Greek report with photos: http://androsfilm.blogspot.de/2015/02/goodfaith_27.html

Upload News

Ship master data