General information

IMO:
7807380
MMSI:
Callsign:
3EIE3
Width:
18.0 m
Length:
81.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Other Ship
Ship type:
Flag:
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Constrained by draught
Course:
104.5° / 0.0
Heading:
51.0° / 0.0
Speed:
Max speed:
Status:
moored
Location:
Vigo (Vigo Port)
Area:
Spain
Last seen:
2021-01-28
2110 days ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
2346 days ago
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Please log in to see latest port calls

Log in

Latest Waypoints

Please log in to see latest waypoints

Log in

Latest news

arrived Ghent Scrapyard

Wed Jan 06 12:33:10 CET 2021 BerndU

Arrived Ghent Scrapyard 13.12.20 http://www.shipspotting.com/gallery/photo.php?lid=3240576

Seismic Research off the Coast of Suriname

Wed Jun 05 12:42:21 CEST 2019 dhewson

The Maritime Authority of Suriname has issued the following Notice to Mariners: "From June 7th till August 12th, 2019, the survey vessel HARRIER EXPLORER will conduct a seismic survey at one hundred and fifty nautical miles (150 NM) off the coast of Suriname. The survey vessel will be towing a seismic cable with a length of twelve 1/2 kilometer (12.1 km) will be towed. Vessels must maintain a safe distance of at least eight nautical miles (8 NM) of the HARRIER EXPLORER. During the operation HARRIER EXPLORER will be restricted in maneuverability and will display the relevant characters. The vessel SHANNON will serve as a support vessel during the operations. Ship communication is through the VHF channels 16 and 68. All ships are requested to take notice of the above mentioned."

Norway cleared for eastern Barents survey

Thu Jun 09 21:36:04 CEST 2011 arnekiel

Seismic acquisition can go ahead in the eastern part of the Barents Sea from July 7, according to the Norwegian Petroleum Directorate (NPD), Offshore magazine reports. NPD will be responsible for seismic acquisition on behalf of the Norwegian authorities, with PGS’ Harrier Explorer performing the work. The vessel is currently sailing to the Jan Mayen region, where it should start seismic acquisition on June 10, with the program set to last between three and four weeks. More at http://www.offshore-mag.com/index/article-display/6392060614/articles/offshore/geology-geophysics/north-sea-northwest-europe/2011/june/norway-cleared_for.html

Upload News

Ship master data