General information

IMO:
9211975
MMSI:
235000864
Callsign:
ZQYC3
Width:
16.0 m
Length:
93.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Passenger ship
Ship type:
Flag:
United Kingdom
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
328.6° / 0.0
Heading:
330.0° / 0.0
Speed:
Max speed:
Status:
moving
Area:
Inner Seas
Last seen:
2026-11-07
1 day ago
 
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
100 days ago 
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Please log in to see latest port calls

Log in

Latest Waypoints

Please log in to see latest waypoints

Log in

Latest news

Ferry suffered main engine issue

Mon Nov 02 09:55:25 CET 2026 Timsen

On the morning of Oct 29, the 'Hebrides', serving on the route Uig - Tarbert - Lochmaddy, suffered a technical issue with the starboard side main engine, which required further investigations. As a consequence, the scheduled 09:40 a.m. sailing, departing from Uig, was delayed. Engineers have identified the issue and started repairs, which were expected to take approximately one hour to be completed. On Oct 30 another technical issue required further investigation, so that there was a delay to the 09:40 a.m. sailing from Uig, which finally departed at 10:00 a.m. The ferry also departed Uig with a delay at 3:11 p.m., one hour and 11 mins late.

Ferry suffered engine issue

Tue Oct 20 10:06:12 CEST 2026 Timsen

The 'Hebrides', serving on the route Uig - Tarbert, suffered a technical issue with the port side main engine on the morning of Oct 15, which needed further investigations and caused delays. On the evening of Oct 19, repairs were completed, and the vessel started loading in Uig. After the return to service, the vessel was operating approximately 1,5 hours behind schedule.

Ferry suffered issue with bow visor

Mon Oct 05 09:35:36 CEST 2026 Timsen

The 'Hebrides', serving on the route Uig - Tarbert, suffered a technical issue with the bow visor on the morning of Sep 12. While technicians were called and successfully fixed the issue, the ship was delayed throughout the day, gradually reducing it. It departed Lochmaddy at 6:36 p.m., one hour 51 minutes late ,with an ETA in Uig as of 8:21 p.m.

Upload News

Ship master data