General information

IMO:
7935321
MMSI:
211298100
Callsign:
DLYI
Width:
13.0 m
Length:
56.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Passenger ship
Ship type:
Flag:
Germany
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Not under command
Course:
0.0° / -128.0
Heading:
511.0° / -128.0
Speed:
Max speed:
Status:
moored
Location:
Floro (Fugleskjarskaia)
Area:
Norwegian Sea
Last seen:
2019-03-01
2808 days ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
2808 days ago
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Please log in to see latest port calls

Log in

Latest Waypoints

Please log in to see latest waypoints

Log in

Latest news

Ferry for breaking up in Esbjerg

Thu Sep 06 09:49:16 CEST 2018 Timsen

The "Insel Amrum" has arrived in Esbjerg for scrap already on June 26, 2018. Photo: http://www.shipspotting.com/gallery/photo.php?lid=2907154

Ferry breached in Nordstrand

Sun Mar 18 16:04:30 CET 2018 Timsen

Upon berthing in the port of Strucklahnungshörn upon Nordstrand the "Insel Amrum" was caught by strong wind gusts of the storm Irenäus and allided with the corner of a sheet piling on March 17, 2018, at 2.20 p.m. The ferry whch had on board 12 passengers, a crew of six, three cars and a trailer suffered strong water ingress. All people were able to disembark safely. The lifeboat "Eiswette" of the DGzRS attended and started dewatering the ferry with submersible pumps. Also the volunteer forces of the fire rescues from Nordstrand, Hattstedt and Husum, the Technical Support Work (THW) and the water police were on scene and started to stabilize the ship jointly with representatives of the NPDG (Neue Pellwormer Dampfschiffahrts GmbH). They managed to patch the leak. On March 18 at 1.30 p.m. the ferry docked at the Husum Shipyard for repairs. The ferry "Hilligenlei" was called as a replacement ship in the Nordstrand-Pellworm-service. The "Insel Amrum" left the yard again after repairs on March 26 at 8.30 a.m and headed to Pellworm in order to resume the service between the island and Nordstrand. German reports with photos: http://www.foerde.news/news-bilder/2018-03-17-faehre-nordstrand/2018-03-17%20%20Wassereinbruch%20auf%20Inself%C3%A4hre%20%282%29.jpg https://www.seenotretter.de/aktuelles/neuigkeiten/ansicht/news/autofaehre-auf-nordstrand-leckgeschlagen/

Upload News

Ship master data