General information

IMO:
9223289
MMSI:
412055000
Callsign:
BOKF
Width:
36.0 m
Length:
156.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
China
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
282.1° / 0.0
Heading:
280.0° / 0.0
Speed:
Max speed:
Status:
moving
Area:
Andaman Sea
Last seen:
2026-11-06
5 days ago
 
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
7 days ago 
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Please log in to see latest port calls

Log in

Latest Waypoints

Please log in to see latest waypoints

Log in

Latest news

MV Le Boreal on Board

Mon Jan 18 16:30:40 CET 2016 BerndU

MV Le Boréal has been lifted on board of the Chinese dock ship "Kang Sheng Kou". The ship shut be repaired on a European yard : www.schiffsjournal.de/wp-content/uploads/Le-Bor%C3%A9al-auf-dem-Ladedeck-der-Kang-Sheng-Kou.jpeg

Kang Sheng Kou offloaded oil rig on unexpected stop at Nanaimo

Sat Jun 11 14:43:39 CEST 2011 Timsen

On June 6, 2011, the 44 ballast tanks inside the "Kang Sheng Kou" were flooded in order to release the ship's cargo, the offshore drilling platform "Spartan 151". The rig was carried into the Nanaimo harbour on the deck of the heavy-lift vessel on June 1 on its journey from the Gulf of Mexico to Alaska's Cook Inlet. The drilling platform was floated off the ship and tugboats towed it to Duke Point, where it will undergo repairs before proceeding to the Cook Inlet. Cosco and Spartan Drilling had decided not to re-enter U.S. waters to avoid a penalty under the Jones Act, U.S. shipping legislation. The act requires goods transported on water between U.S. ports be on ships built and flagged in the U.S., and owned and crewed by U.S. citizens, to support the U.S. maritime industry.

Transport with rig reached Nanaimo

Fri Jun 03 11:17:47 CEST 2011 Timsen

The "Kang Sheng Kou arrived" mooreed in the Port of Nanaimo carrying a massive offshore drilling platform in the evening of May 31, 2011. She could remain in harbour several weeks, if owners decide to hire local contractors for repairs to damages received during a long circuitous voyage from Texas. The owner of the rig is looking to have some maintenance and inspection work done to the rig prior to departing to Alaska.

Upload News

Ship master data