General information

IMO:
9147722
MMSI:
232003073
Callsign:
MXZG2
Width:
13.0 m
Length:
44.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Passenger ship
Ship type:
Flag:
United Kingdom
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
248.5° / 0.0
Heading:
250.0° / 0.0
Speed:
Max speed:
Status:
moving
Area:
Inner Seas
Last seen:
2026-07-18
114 days ago
 
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
114 days ago 
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Please log in to see latest port calls

Log in

Latest Waypoints

Please log in to see latest waypoints

Log in

Latest news

Ferry suffered technical issue

Wed Aug 26 16:36:18 CEST 2026 Timsen

The 'Loch Alainn', operating on the route Ardmhor - Eriskay, suffered a technical issue on Aug 25. After the issue had been resolved, the scheduled 07:00 a.m. departure from Ardmhor was delayed to 07:30 a.m. This had a knock-on affect to later sailings. Tge customers, however, were asked to arrive at normal time for sailings.

Sailings cancelled due to hydraulic issue

Wed Jul 22 09:21:41 CEST 2026 Timsen

On July 21, the 'Loch Alainn', serving on the route Ardmhor (Barra) - Eriskay, suffered a hydraulic issue that required further investigations. As a consequence, the scheduled departures from Ardmhor at 3:45 p.m. and from Eriskay at 4:35 p.m. had to be cancelled. The 5:30 p.m. departure from Ardmhor finally started at 6:00 p.m.

Sailings cancelled and at risk due to technical issue with sewage system

Thu Jul 16 21:18:10 CEST 2026 Timsen

The 'Loch Alainn', serving on the route Ardmhor-Eriskay, suffered a technical issue with the sewage system on July 16. As a consequence, the scheduled sailings from Ardmhor at 07:00 a.m. and from Eriskay at 08.10 a.m. had to be cancelled. The crossings at 09:25 a.m. from Ardmhor and at 10:15 a.m. from Eriskay were liable to disruption or cancellation at short notice. After the technical issue was resolved, the service resumed at 09:45 a.m. and operated delayed with an expected to return to timetable with the 1:00 p.m. departure from Eriskay.

Upload News

Ship master data