General information

IMO:
9006409
MMSI:
232003165
Callsign:
MNFE3
Width:
13.0 m
Length:
76.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Passenger ship
Ship type:
Flag:
United Kingdom
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
320.5° / 127.0
Heading:
326.0° / 127.0
Speed:
Max speed:
Status:
moving
Area:
Inner Seas
Last seen:
2026-11-06
3 days ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
3 days ago
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Please log in to see latest port calls

Log in

Latest Waypoints

Please log in to see latest waypoints

Log in

Latest news

Ferry suffered ramp issue

Mon Oct 05 09:24:08 CEST 2026 Timsen

The 'Loch Dunvegan', serving on the route Colintraive - Rhubodach, suffered a ramp damage on Oct 3. Repair attempts have been unsuccessful, and the vessel had thus to continue operating single ended. The service was resumed with the 3:30 p.m. sailing departing from the port of Colintraive. Vehicles may be required to reverse on/off the car deck until further notice.

Ferry suffered ramp issue

Wed Aug 05 09:53:11 CEST 2026 Timsen

The 'Loch Dunvegan', serving on the route Colintraive - Rhubodach, suffered a technical issue with the ramp on Aug 4. As a consequence, the vessel was operating single ended with vehicles being required to reverse on to the vessel or turn on the deck. After the ramp issue was successfully adressed, the vessel was no longer operating single ended later in the day.

Ferry suffered issue with rescue boat

Mon Jul 13 15:39:55 CEST 2026 Timsen

Thr 'Loch Dunvegan', serving on the route Colintraive-Rhubodach, suffered a technical issue with the rescue boat on July 12, 2026. As a consequence, the following sailings were cancelled: Departure Colintraive 11.30 a.m., 12:00 p.m. Departure Rhubodach 11.40 a.m., 12:10 p.m. All remaining sailings were liable to disruption or cancellation at short notice. Contractors were due to attend the vessel on July 13, and a further update would be provided once further information has become available.

Upload News

Ship master data