General information

IMO:
7018422
MMSI:
Callsign:
IMRJ
Width:
14.0 m
Length:
96.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Italy
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
0.0° / -128.0
Heading:
511.0° / -128.0
Speed:
Max speed:
Status:
moored
Location:
Taranto (SPG Levante)
Area:
Ionian Sea
Last seen:
2017-12-22
3243 days ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
3243 days ago
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Please log in to see latest port calls

Log in

Latest Waypoints

Please log in to see latest waypoints

Log in

Latest news

Demolition of cement carrier approved

Fri Apr 16 12:00:30 CEST 2021 Timsen

The port captain of Genoa has approved the recycling plan for the 'Mar Grande'. The demolition will be carried out in Genoa at the San Giorgio del Porto shipyard. The ship is already moored in the port of Genoa and will be scrapped in about 90 days. It is the first case of ship demolition in Italy initiated pursuant to EU Regulation 1257/2013 and the current guidelines of the International Maritime Organization. The operations include a first lightening phase with the ship still floating, followed by a second phase in the dock during which all the liquids still present on board are removed such as residual oils, bilge water, etc.. Then the steel will be cut down. All hazardous materials on board - including asbestos - have been rigorously inventoried and the ship recycling plan approved by the Maritime Authority has certified compliance with current regulations on waste management and the prevention of environmental damages. All waste, produced by the demolition of the vessel, will therefore be characterized and subject to precise tracking to the plants outside the port. The approval process saw the involvement of the Metropolitan City of Genoa, which at the time issued to the "San Giorgio del Porto" shipyard the integrated environmental authorization for the ship demolition. Report with photos: https://www.nauticareport.it/dettnews/news/guardia_costiera__ship_recycling_approvato_a_genova_il_primo_piano_nazionale-3763-23146/

Upload News

Ship master data