MARRY-S
Course/Position
1 min ago
Latest ports

Latest Waypoints

Latest news
Fire during maintenance at Damen Shiprepair
A fire broke out in the hold of the 'Marry S' on the early morning of Jan 12, 2026, at the Damen Shiprepair at the Lange Lijnbaan in Harlingen. Thanks to a quick extinguishing attempt, the spread of the fire could be prevented by the the fire department, which responded with heavy equipment. The fire caused considerable smoke. The ship's hatches were closed. The emergency services were hampered by the weather condition with the roads in Friesland being extremely slippery. The first units have returned to the station after the fire was under control at around 2 a.m. There have been no reports of injuries. The ventilation of the warehouse was then initiated to remove the smoke. The fire was likely caused by a short circuit in a cable, which ignited several cleaning cloths. Because these cloths were wet, a large amount of smoke was released. The damage remained limited. The ship, which had arrived in Harlingen on Dec 17, 2025, for maintenance, was scheduled to return to service at the end of January. Reports with photos and video: https://www.schuttevaer.nl/nieuws/actueel/2026/01/12/grote-brand-in-schip-marry-s-bij-damen-harlingen/ https://www.omropfryslan.nl/nl/nieuws/18113816/zeer-grote-brand-op-schip-in-harlingen https://www.msn.com/nl-nl/nieuws/Binnenland/zeer-grote-brand-in-scheepswerf-harlingen/ar-AA1U1mwS?cvid=69648b78bce14473b940a9ace87c5091&ocid=hpmsn https://www.omropfryslan.nl/nl/nieuws/18113816/brand-op-schip-in-harlingen-kwam-waarschijnlijk-door-kortsluiting
Blackout off Land's End
The 'Marry S.' suffered a blackout and engine failure about seven miles northwest of Pendeen, Land's End, on Jan 20, 2020, at 05.25 a.m. An investigation revealed that a leaking oil pipe had caused the problem. The crew carried out repair works, and the vessel resumed its voyage from Ijmuiden to Drogheda the same day with an ETA as of Jan 27, 7 p.m.
Ships docked in Antwerp after collision
The "Aldebaran J" berthed in the Vrasen Dock on June 28 at 9.50 p.m. The "Marry S" which had suffered severe bow damage berthed in dock 5 on June 29 at 7.15 a.m. Both will need to be repaired in a yard before sailing again. The hull of the "Aldebaran J" was punctured above the water line, some of the containers suffered damage or were destroyed too. The "Marry S" arrived at the Holland Shipyards in Giessendam for repairs on July 5 at 5 a.m.
Upload News

