General information

IMO:
9148805
MMSI:
511101811
Callsign:
T8A5309
Width:
16.0 m
Length:
100.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Other Ship
Ship type:
Flag:
Palau
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Anchored
Course:
360.0° / 0.0
Heading:
277.0° / 0.0
Speed:
Max speed:
Status:
anchorage
Area:
SOUTH PACIFIC OCEAN
Last seen:
2026-11-09
3 min ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
5 min ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Please log in to see latest port calls

Log in

Latest Waypoints

Please log in to see latest waypoints

Log in

Latest news

Detention in Suva

Fri Apr 17 10:13:31 CEST 2026 Timsen

The 'Micronesian Pride' was detained following a Port State Control inspection in Suva on April 15, 2026. The insepctors found with eight deficiencies, including one which was being regarded as seriously and a ground for a detention. The inspection was conducted under the Tokyo Memorandum of Understanding (MOU).

Svitzer contracted for container removal

Thu Feb 09 15:21:19 CET 2012 Timsen

Svitzer was contracted for the removal of damaged containers from the "Eline Enterprise" in Darwin harbor. Some containers were filled with vessels containing ethylene gas which is flammable and can be violently explosive. The plan was first to remove all undamaged containers. The next step was then to get the damaged containers away from the ship safely. Several containers aboard the ship had moved, as the vessel sailed under very harsh and difficult weather conditions, 26 January.

Unloading of damaged gas containers delayed

Wed Feb 08 09:01:06 CET 2012 arnekiel

The unloading of damaged gas containers from a ship in Darwin Harbour has stalled. The E-Line Enterprise has been anchored off the Darwin coast since containers on it were damaged in severe weather two weeks ago, leaking tonnes of explosive gases. Crews started moving the containers from the ship to barges on Monday in a process that was expected to take two days. But further contract negotiations between the ship's owner and the recovery operators today have stopped the unloading of the ship. The Darwin Port Corporation says it hopes the last of the containers will be unloaded tomorrow. http://au.finance.yahoo.com/news/unloading-damaged-gas-containers-delayed-050011805.html

Upload News

Ship master data