General information

IMO:
9575333
MMSI:
630001277
Callsign:
5LDA6
Width:
17.0 m
Length:
140.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Tankship
Ship type:
Flag:
Guinea Bissau
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
117.1° / -2.0
Heading:
113.0° / -2.0
Speed:
Max speed:
Status:
moving
Area:
Mediterranean Sea
Last seen:
2026-11-10
20 hours ago
 
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
21 hours ago 
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Please log in to see latest port calls

Log in

Latest Waypoints

Please log in to see latest waypoints

Log in

Latest news

Detention in Sevilla

Thu Aug 13 23:39:03 CEST 2026 Timsen

The "Panjali Teymurov" was detwined for the second time within a few months, this time on July 28, 2026, in Sevilla, with eight deficiencies, three of which being regarded as seriously and grounds for a detention: 1) Structural conditions - Steering gear Not as required 2) Pollution Prevention - Other (Marpol Annex II) Other 3) Other - Other safety in general Other The vessel was released again on Aug 10. The last detention was on Nov 5, 2025, in Elevsina with three deficiencies for seven days. https://www.facebook.com/share/p/1JtTtrAn6N/

Detention in Elefsis

Tue Nov 18 10:06:43 CET 2025 Timsen

On Nov 5, 2025, the "Panjali Teymurov" was detained in Elefsis with three deficiencies, two of which being regarded as seriously and grounds for a detention: 1) Labour conditions - Non-payment of wages Non payment of wages 2) ISM - Ism certificate Not as required The vessel was released again on Nov 10 and left the port enroute to Giurgiulesti with an ETA as of Nov 16. https://www.facebook.com/profile.php?id=100063576908591

Palmali takes delivery of tanker MUGAN from Besiktras Shipyard

Wed Feb 15 09:43:34 CET 2012 arnekiel

Palmali Group took delivery on February 10, 2012, the fifth product tanker of Armada series, Project RST22M from Yalova-based Besiktas Shipyard, the Marine Engineering Bureau said Tuesday. The 7,100DWT tanker (building number 16) was laid on December 23, 2009, launched and named as Mugan on November 29, 2011. Palmali Group placed an order for 10 tankers of Armada series of Project RST22M with Besiktas Shipyard and in late May implemented an option for 5 more vessels. The Turkish shipbuilder plans to perform the order by the end of 2013. Two tankers of the series have been put into service. The Project RST22M product tankers are successors of Project 005RST01, or "Armada" first series. The Armada serial ships were designed by Marine Engineering Bureau for Palmali Group and built at the shipyards of Selah and ADA in Tuzla (Turkey) in 2002 -2006. The Project RST22m is an updated version of the 2nd series tankers (Project RST22), which were built at Nizhny Novgorod-based Krasnoye Sormovo in 2008-2009. Ten tankers of the first Armada and five tankers of the New Armada have been engaged in 'river-sea' transportation of crude oil, fuel oil, diesel fuel and other petroleum products and vegetable oils. The vessels also carry the commodities on the shipping lanes in the Caspian, Black, Mediterranean, Baltic and North Seas, including the routes around Europe and in the Irish Sea.

Upload News

Ship master data