General information

IMO:
8917118
MMSI:
237236400
Callsign:
SW6688
Width:
14.0 m
Length:
73.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Passenger ship
Ship type:
Flag:
Greece
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Undefined
Course:
0.0° / -128.0
Heading:
511.0° / -128.0
Speed:
Max speed:
Status:
waiting
Area:
Greece
Last seen:
2023-10-30
1105 days ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
1105 days ago
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Please log in to see latest port calls

Log in

Latest Waypoints

Please log in to see latest waypoints

Log in

Latest news

Ferry suffered engine fault

Thu May 05 10:25:46 CEST 2022 Timsen

The Port Authority of Patras was informed on May 4, 2022, at noon by the Captain the 'Pantanassa' about a fault in the starboard side main engine and specifically of the electronic control of its movement, while the ferry was in the process of leaving for a scheduled route from the eastern pier of Patras Rio to Antirrio. The Central Port Authority of Patras initially banned the departure of the ship. After presenting a certificate of seaworthiness by the classification society that monitors it, it was allowed to continue on its itinerary.

Mechanical damage in Salamis

Fri Jun 26 10:40:27 CEST 2020 Timsen

The Port Authority of Salamis was informed in the evening of June 25, 2020, about a mechanical failure of the 'Panatanassa' while in the port. The 3rd Port Department of Salamis of the Central Port Authority of Piraeus banned the ship from sailing until the repair of the damage and the presentation of a certificate by the monitoring classification society. The ship was still berthed in the Faneromeni Salaminas Port as of June 26.

Engine failure in Andirrion

Thu Apr 25 10:25:29 CEST 2019 Timsen

In the evening of April 24, 2019, the Patras Port Authority was informed about a mechanical damage of the "Pantanassa". The ferry had berthed at the western pier of Andirrion at 10.15 p.mn. Upon its planned departure the crew remarked that the starboard side main engine could not be started. The ship, serving the Patras Rio-Antirrio route, was detained until the damage was repaired. By April 25 the ferry remained stationary in port.

Upload News

Ship master data