General information

IMO:
8511885
MMSI:
620800334
Callsign:
D6A4334
Width:
11.0 m
Length:
79.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Comoros
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
185.2° / 0.0
Heading:
342.0° / 0.0
Speed:
Max speed:
Status:
moored
Location:
Burgas (Burgas Port)
Area:
Bulgaria
Last seen:
2026-11-08
2 min ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
3 min ago
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Please log in to see latest port calls

Log in

Latest Waypoints

Please log in to see latest waypoints

Log in

Latest news

Second detention within one month

Wed Apr 22 09:26:03 CEST 2026 Timsen

One month after the last detention, the "Ruby" was detained again in Izmir with 23 deficiencies, seven of which being regarded as seriously and grounds for a detention: 1) Radio communications - Recognized Mobil Satellite Services / Ship - earth station Inoperative 2) Life saving Appliances - Rescue boats Inoperative 3) Propulsion and auxiliary machinery - Propulsion main engine Not as required 4) Propulsion and auxiliary machinery - Auxiliary machinery Not as required 5) Propulsion and auxiliary machinery - Operation of machinery Lack of familiarity 6) Emergency system - Fire drills Lack of training 7) ISM - Ism certificate Not as required The vessel was released again on April 21 and left the port enroute to Burgas. The last detention was on Feb 19 in Hamburg, with 27 deficiencies for twelve days. https://www.facebook.com/profile.php?id=100063576908591

Detention in Hamburg

Mon Mar 02 18:39:15 CET 2026 Timsen

The "Rubyn" was detained in Hamburg after its arrival on Feb 19, 2026, following an inspection with six deficiencies: 1) Fire safety - Fire detection and alarm system Inoperative 2) Fire safety - Emergency escape Breathing Device and disposition Insufficient 3) Fire safety - Evaluation of crew performance Lack of training 4) Safety of navigation - Electronis charts (ECDIS) Not as required 5) Structural conditons - Steering gear Damaged 6) Emergency system - Emergency lighting, batteries and switches Inoperative The vessel was released again on March 2 and left the port enroute to Dordrecht with an ETA as of March 4. https://www.facebook.com/share/p/18HuyBpTvY/

Upload News

Ship master data