General information

IMO:
8407266
MMSI:
419383000
Callsign:
VVGF
Width:
25.0 m
Length:
146.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Other Ship
Ship type:
Flag:
India
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
238.8° / 0.0
Heading:
149.0° / 0.0
Speed:
Max speed:
Status:
moored
Location:
Area:
South Asia
Last seen:
2026-04-11
212 days ago
 
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
228 days ago 
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Please log in to see latest port calls

Log in

Latest Waypoints

Please log in to see latest waypoints

Log in

Latest news

Drill ship adrift in cyclone

Mon May 17 19:22:57 CEST 2021 Timsen

The 'Sagar Bhushan' with 101 people on board went adrift in position 19 24 25.2N, 071 50 45.6E, approximately 20 nautical miles from the Panna Field on May 17, 2021, at 8.30 a.m. The vessel lost all of its eight anchors. The INS 'Talwar' has proceeded to assist the ship as well as the accommodation barge 'SS-3' with 196 personnel on board. Both were drifting about 50 nautical miles Southeast of Pipavav Port. All the crew members on board the 'Sagar Bhushan' were safe and a towing connection has been established by the 'Samudra Sevak' and 'SV Cheel' of OSV. The ship arrived in Mumbai harbour on May 21 under tow.

Drill sihip repaired and cleared to sail

Tue Dec 18 09:41:24 CET 2018 Timsen

The "Sagar Bhushan", after completion of repairs of fire damage suffered on Feb 13, had moved from the Cochin Shipyard to the outer roads of Cochin, from where it conducted trials. After a class surveyor inspection the drill ship has been cleared to return to service. The vessel then headed to Mumbai port.

Damaged drill ship still in dry dock

Sun Jul 29 14:51:03 CEST 2018 Timsen

The "Sagar Bhushan" was still in dry dock and the repair was in progress. The intended spares for completion of the work is being prevailed upon the suppliers by the shipyard for early supply to complete the work and hand over the vessel to its management Shipping Corporation of India. It was expected that the work was likely to take another month.

Upload News

Ship master data