General information

IMO:
8802313
MMSI:
Callsign:
PF8488
Width:
18.0 m
Length:
110.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Passenger ship
Ship type:
Flag:
Netherlands
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
93.0° / 0.0
Heading:
356.0° / 0.0
Speed:
Max speed:
Status:
moored
Location:
Ghent (BE) (Ghent)
Area:
Belgium
Last seen:
2018-11-01
2929 days ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
2929 days ago
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Please log in to see latest port calls

Log in

Latest Waypoints

Please log in to see latest waypoints

Log in

Latest news

Schulpengat arrived at breakers in Ghent

Thu Nov 01 11:21:56 CET 2018 Timsen

In the early morning of Oct 31, 2018, the "Schulpengat" arrived at the Belgian recycling company Galloo. The Tferry that served for years between Den Helder and Texel had sailed via the Westerschelde and the Ghent Canal to Terneuzen to the breakers in Ghent. Waiting for a pilot for the Wester Scheldt, the trip to Flushing was delayed by hours. At 5.00 a.m. the ferry eventually passed the locks of Terneuzen. Dutch reports with photo and video: https://www.omroepzeeland.nl/nieuws/109130/Veerboot-Schulpengat-aangekomen-bij-sloper-in-Gent https://www.hollandskroonactueel.nl/2018/10/31/schulpengat-onderweg-naar-haar-einde/ https://www.texelsecourant.nl/nieuws/algemeen/74684/ontmanteling-schulpengat-in-volle-gang https://www.texelsecourant.nl/nieuws/algemeen/78725/schulpengat-verliest-gezicht-

Sold to breakers...

Sun Oct 21 17:00:14 CEST 2018 Timsen

..in Ghent with delivery date Oct 2018.

Ferry sidelined due to technical trouble

Tue Aug 09 11:43:04 CEST 2016 Timsen

In the morning of Aug 6, 2016, the "Schulpengat" was struggling with a technical fault and was sidelined in Den Helder. The waiting time in Den Helder increased to 1 ½ hours while the ferry was out of service. The new ferry "Texelstroom" has also been struggling with defects. It was intended that theship would replace the ageing "Schulpengat" in 2015 and the ship would be sold. But for several times the date for the first regular sailing had to be postponed.

Upload News

Ship master data