General information

IMO:
9639763
MMSI:
538004921
Callsign:
V7ZV2
Width:
28.0 m
Length:
180.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Marshall Islands
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Anchored
Course:
296.3° / 0.0
Heading:
107.0° / 0.0
Speed:
Max speed:
Status:
anchorage
Area:
NORTH PACIFIC OCEAN
Last seen:
2026-11-08
1 min ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
1 min ago
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Please log in to see latest port calls

Log in

Latest Waypoints

Please log in to see latest waypoints

Log in

Latest news

Cargo ship assisted in case of human trafficing

Mon Sep 09 11:25:04 CEST 2024 Timsen

On the evening of Sep 5, 2024, the Port Authority of Thira was requested by the Greek Coast Guard-Hellenic Coast Guard to provide assistance to a vessel that was in a difficult position 12 nautical miles south of Anafi. A patrol vessel rushed to the scene, as well as the passenger-boat 'Melina' and the 'Summer Sea', which was en route from Maentyluoto to Iskenderun. A Polish sailing ship was spotted, and the 'Melina' took on board the 4 people, among them 23 men, 03 women and 17 minors, and then transported them ato the port of Thira, where they disembarked safely. Two men, aged 25 and 22, were arrested by the Thiras Port Authority, which was conducting the preliminary investigation, as human traffickers, for violating article 83 of Law 3386/05 (Illegal entry into the country), article 25 of Law. 5038/23 (Facilitation) in conjunction with article 47 of the P.C. (Associate), as well as of article 306 of the Civil Code. (Report). The vessel was confiscated.

Arrest warrant for damage to barge

Wed Jul 17 10:25:17 CEST 2019 Timsen

An arrest warrant for the "Pretty Team" was issued on July 12, 2019, after the vessel discharged concrete and caused damages to a nearby barge, in Alabama on March 26. According to the complaint, the crane barge "Conquest MB 1" was moored at an adjacent facility on Mar 26, when the "Pretty Team" began unloading the concrete. Dust was then allowed to drift onto and contaminate the barge and its equipment. The discharged concrete has caused at least 1.5 million U.S. dollars in damage to the barge plus additional damages from downtime, demurrage, delay, lost profit and incidental costs.

Upload News

Ship master data