General information

IMO:
MMSI:
238893840
Callsign:
9AA621
Width:
21.0 m
Length:
183.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Croatia
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
270.6° / -128.0
Heading:
511.0° / -128.0
Speed:
Max speed:
Status:
moving
Area:
Romania
Last seen:
2024-01-27
1016 days ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
1016 days ago
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Please log in to see latest port calls

Log in

Latest Waypoints

Please log in to see latest waypoints

Log in

Latest news

Flooded barge patched

Mon May 30 13:43:22 CEST 2016 Timsen

The barges which were pushed by the Segesta“ and ran aground on May 25 at Neustadtl on the Danube could be patched until May 28. Two compartments had been flooded, and the attempts of the fire rescue to pump out the water with submersible pumps had failed. They managed to patch only the smaller of two leaks of the barges which were loaded with 800 tons slag sand. Commercial divers worked until the evening of May 28 to patch the leak. On May 20 the convoy could leave the accident site. Reports with photos and video: https://www.einsatzdoku.at/2016/05/26/noe-bez-am-frachtschiff-auf-donau-leckgeschlagen/ http://tvthek.orf.at/program/Niederoesterreich-heute/70017/Niederoesterreich-heute/12828004/Tauchereinsatz-in-der-Donau/12833230

Water ingress in barges on Danube

Thu May 26 10:32:31 CEST 2016 Timsen

In the evening of May 25, 2016, two barges being pushed by "Segesta" (ENI-No.: 35054536) on the Danube in Strudengau in the Amstetten region suffered water ingress. The convoy was underway with 800 tons gravel and sprang aleak around 4.30 p.m. The fire brigades from Nabegg and Neustadtl were alerted and attended with submersible pumps. The barges were secured at the shore and were to be lightered onto another ship as the water ingress could not yet be coped. The work was expected to last until May 26. Austrian reports with photos: http://kurier.at/chronik/niederoesterreich/frachtschiff-auf-der-donau-schlug-leck/200.964.537 https://www.facebook.com/ffnabegg/posts/1015605035198341

Upload News

Ship master data