General information

IMO:
8512279
MMSI:
248139000
Callsign:
9HA6529
Width:
40.0 m
Length:
173.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Cargo Ship
Ship type:
Flag:
Malta
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moored
Course:
86.8° / 0.0
Heading:
21.0° / 0.0
Speed:
Max speed:
Status:
moored
Location:
Ras Al Khaimah (Ras al Khaimah Port)
Area:
Middle East
Last seen:
2026-11-08
3 min ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
30 min ago
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Please log in to see latest port calls

Log in

Latest Waypoints

Please log in to see latest waypoints

Log in

Latest news

Transshelf finally left Yokosuka with damaged USS Fitzgerald

Sun Dec 10 18:22:30 CET 2017 Timsen

The collision-damaged USS "Fitzgerald" has finally left Yokosuka for repairs stateside after an earlier attempt was canceled due to a botched loading process. The guided-missile destroyer departed its base on Dec 9 in the morning on board the heavy lift vessel "Transshelf" to be taken to the Ingalls Shipbuilding in Pascagoula, Miss., for repairs and upgrades. The crippled warship already attempted to leave Yokosuka on Nov. 23, but was sent back days later to repair two new punctures in the ship's hull, caused by the "Transshelf"'s steel support structure during loading. Huntington Ingalls Industries was chosen to repair the destroyer because the company would be able to restore the ship in the shortest amount of time. Given the complexity of the work and the significant unknowns of the restoration, the Navy determined that only an Arleigh Burke-class shipbuilder could perform the effort. The project's start date, scope, cost and timeline were still to be determined. Report with photo and video: https://www.military.com/daily-news/2017/12/09/fitzgerald-finally-departs-japan-repairs-mississippi.html

Destroyer damaged during transport onto Transshelf

Mon Nov 27 19:22:32 CET 2017 Timsen

The U.S. Navy experienced yet another setback on Nov 26, 2017, when the crippled destroyer USS "Fitzgerald" was damaged as it was being loaded onto the "Transshelf" to be taken to Mississippi for repairs. The guided-missile destroyer was towed out to deep water to begin the heavy lift process on Nov 24. But the "Fitzgerald" sustained two punctures to her hull from the "Transshelf"'s steel support structure during load at anchorage, and was forced to return to its home port in Yokosuka. Repairs were expected to extend the on-load process by a few days, after which the "Transshelf" will transport Fitzgerald to Huntington Ingalls Industries in Pascagoula, Mississippi, for further repairs and upgrades Prior to the incident, the USS "Fitzgerald" had already seen minor improvements, including de-watering, de-fueling, hull and superstructure repairs and having key systems placed in lay-up maintenance. Report with photo and video: http://www.newsweek.com/crippled-us-warship-more-damage-heads-repairs-722959 https://www.youtube.com/watch?v=AalbxJtlLBE

Boskalis contracted to carry USS Fitzgerald to Pascagoula

Wed Sep 06 10:30:53 CEST 2017 Timsen

Boskalis Westminster announced on Sep 6, 2017, that it was contracted to transport the heavily damaged destroyer USS "Fitzgerald" back to the United States. On June 17, it had been in collision with the container ship "ACX Crystal" in the Bay of Tokyo. The warship will be transported to Pascagoula aboard the "Transshelf" of the Boskalis subsidiary Dockwise which will take aboard the destroyer in Yokosuka. The transport will coust $ 50 million.

Upload News

Ship master data