General information

IMO:
7805162
MMSI:
257377500
Callsign:
LIPA
Width:
12.0 m
Length:
78.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Passenger ship
Ship type:
Flag:
Norway
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
143.7° / 0.0
Heading:
62.0° / 0.0
Speed:
Max speed:
Status:
moored
Location:
Festvåg (Festvåg Port)
Area:
North Europe
Last seen:
2026-11-03
5 days ago
 
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
5 days ago 
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Please log in to see latest port calls

Log in

Latest Waypoints

Please log in to see latest waypoints

Log in

Latest news

Ferry suffered blackout

Fri Apr 24 08:06:11 CEST 2026 Timsen

The ' Virak', serving on the connection Festvåg – Misten, suffered a blackout on the early morning of April 24, 2026. The passengers were stranded in Mistfjorden.

Ferry sidelined due to technical fault

Mon Mar 10 11:18:49 CET 2025 Timsen

The 'Virak', sailing on the route Forøy–Ågskardet, suffered a technical fault on March 9, 2025, and was sidelined in Ågskardet for troubleshooting. As a consequence, a sailing from Jektvik to Forøy was offered by the ferry 'Ørnes' on March 10 with a departure from Jektvik at 11:00 a.m., arriving in Forøy at approximately 1:15 p.m., and from Forøy at 1:30 p.m., with an arrival in Jektvik at 3:45 p.m. Depending on developments on the 'Virak', further trips throughout the day will be continuously considered.

Sea King and lifeboat sent to assist disabled ferry

Sun Sep 10 16:44:09 CEST 2017 Timsen

On Sep 9, 2017, at 11 p.m. the "Virak", enroute from Misten, encountered engine problems in the Mistfjord on the way to Kjerringøy and stopped amidst the water. Both a Sea King SAR helicopter and lifeboat were sent to assist the ferry which was drifting close to the shore. The crew mamanged to start an auxiliary engine so they hold their position until the lifeboat arrived and towed the ferry to the dock at Festvåg where repairs started.

Upload News

Ship master data