Allgemeine Informationen

IMO:
9482902
MMSI:
235083892
Rufzeichen:
2ECF2
Breite:
16.0 m
Länge:
89.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Passenger ship
Ship type:
Flagge:
United Kingdom
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
218.8° / 0.0
Kompasskurs:
222.0° / 0.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moving
Gebiet:
Inner Seas
Zuletzt empfangen::
2026-11-07
vor 2 Tagen
Source:
T-AIS
Von:
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 2 Tagen
Source:
T-AIS

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Bitte anmelden, um die letzten port calls zu sehen

Log in

Die letzten Wegpunkte

Bitte anmelden, um die letzten wegpunkte zu sehen

Log in

Die neuesten Nachrichten

Sailings cancelled due to technical issue

Sat Oct 10 18:43:18 CEST 2026 Timsen

On Oct 10, the 'Finlaggan', serving the route Kennacraig - Islay, suffered a technical issue which required. further investigations. As a consequence, the 5:45 p.m. sailing from Port Askaig was operated by the 'Isle of Islay'. Due to berth availability, the 'Finlaggan' arrived in Port Askaig at 6:00 p.m. The following sailings were cancelled: Departure Port Askaig – 7:30 p.m. Departure Kennacraig – 8:20 p.m.

Ferry delayed due to technical issue

Tue Oct 06 23:45:10 CEST 2026 Timsen

The 'Finlaggan', serving on the route Kennacraig - Islay, suffered a technical issue with the FRC. As a consequence, the scheduled 1:00 p.m. sailing from Kennacraig departed 55 minutes late with an ETA in Port Askaig as of 3:45 p.m.

Technical issues with bow doors and mezzanine deck

Tue Sep 29 10:06:50 CEST 2026 Timsen

The 'Finlaggan', serving on the route Kennacraig - Islay, suffered a technical issue with the bow doors, which required further investigations, on the morning of Sep 29. As a consequence, the scheduled 07:00 a.m. departure from Kennacraig was delayed. After the issue was successfully resolved, the vessel finally departed with a delay of approximately 15 minutes. Regarding the issues with the mezzanine deck, essential repair works were to be carried out at midday, so that two more sailings had to be cancelled. Affected were the departure from Kennacraig at 1:00 p.m. and from Port Askaig at 3:35 p.m. Sailings operated by the 'Isle of Islay' were operate as timetabled.

News schreiben

Ship master data