General information

IMO:
9482902
MMSI:
235083892
Callsign:
2ECF2
Width:
16.0 m
Length:
89.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Passenger ship
Ship type:
Flag:
United Kingdom
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
218.8° / 0.0
Heading:
222.0° / 0.0
Speed:
Max speed:
Status:
moving
Area:
Inner Seas
Last seen:
2026-11-07
2 days ago
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
2 days ago
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Please log in to see latest port calls

Log in

Latest Waypoints

Please log in to see latest waypoints

Log in

Latest news

Sailings cancelled due to technical issue

Sat Oct 10 18:43:18 CEST 2026 Timsen

On Oct 10, the 'Finlaggan', serving the route Kennacraig - Islay, suffered a technical issue which required. further investigations. As a consequence, the 5:45 p.m. sailing from Port Askaig was operated by the 'Isle of Islay'. Due to berth availability, the 'Finlaggan' arrived in Port Askaig at 6:00 p.m. The following sailings were cancelled: Departure Port Askaig – 7:30 p.m. Departure Kennacraig – 8:20 p.m.

Ferry delayed due to technical issue

Tue Oct 06 23:45:10 CEST 2026 Timsen

The 'Finlaggan', serving on the route Kennacraig - Islay, suffered a technical issue with the FRC. As a consequence, the scheduled 1:00 p.m. sailing from Kennacraig departed 55 minutes late with an ETA in Port Askaig as of 3:45 p.m.

Technical issues with bow doors and mezzanine deck

Tue Sep 29 10:06:50 CEST 2026 Timsen

The 'Finlaggan', serving on the route Kennacraig - Islay, suffered a technical issue with the bow doors, which required further investigations, on the morning of Sep 29. As a consequence, the scheduled 07:00 a.m. departure from Kennacraig was delayed. After the issue was successfully resolved, the vessel finally departed with a delay of approximately 15 minutes. Regarding the issues with the mezzanine deck, essential repair works were to be carried out at midday, so that two more sailings had to be cancelled. Affected were the departure from Kennacraig at 1:00 p.m. and from Port Askaig at 3:35 p.m. Sailings operated by the 'Isle of Islay' were operate as timetabled.

Upload News

Ship master data