ISLE OF MULL
Die letzten Häfen

Die letzten Wegpunkte

Die neuesten Nachrichten
Ferry suffered broken bridge window wiper
The 'Isle of Mull', serving on the route Oban - Craignure, suffered a technical issue with the bridge window wiper on the morning of Sep 14. As a consequence, the sailings starting with the 06:45 a.m. departure from Oban and the 07:55 departure from Craignure had to be cancelled. At 8 a.m., technicians arrived to fix the broken wiper. After the repairs were successfully completed, the ferry resumed operating with the departure from Oban at 3.55 p.m. with four cancelled crossings on the whole.
Ferry suffered pump issue
On July 28, the 'Isle of Mull', serving on the route Oban-Craignure, sufferes a technical issue affecting a pump after the scheduled departure from Oban at 6:15 p.m. The ferry was forced to return to the port, where emergency services attended the ship. The departure from Craignure at 7.25 p.m. was cancelled. The 'Loch Frisa' continued to operate as scheduled. On the morning of July 29, the pump has been repaired, and the 'Isle of Mull' was operating the route as scheduled again. To assist with the backlog of traffic due to the previous cancellations, the 'Clansman' called at Craignure on her way to Oban to pick up remaining passengers.
Bow visor damage needs repairs
The 'Isle of Mull', serving on the route Oban Craignure, suffered a technical issue with the bow visor and had to be removed from service to allow permanent repairs to be carried out between June 23 and July 2. During this period, the ferry 'Isle of Arran' was operating the service along with the ferry 'Loch Frisa'.
News schreiben

