General information

IMO:
8608339
MMSI:
232343000
Callsign:
MJCE3
Width:
17.0 m
Length:
90.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Passenger ship
Ship type:
Flag:
United Kingdom
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Moving
Course:
131.0° / 0.0
Heading:
129.0° / 0.0
Speed:
Max speed:
Status:
moving
Area:
Inner Seas
Last seen:
2026-11-08
16 hours ago
 
Source:
T-AIS
From:
Destination:
ETA:
Summer draft:
Current draft:
Last update:
48 days ago 
Source:
T-AIS

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Please log in to see latest port calls

Log in

Latest Waypoints

Please log in to see latest waypoints

Log in

Latest news

Ferry suffered broken bridge window wiper

Mon Sep 14 19:31:44 CEST 2026 Timsen

The 'Isle of Mull', serving on the route Oban - Craignure, suffered a technical issue with the bridge window wiper on the morning of Sep 14. As a consequence, the sailings starting with the 06:45 a.m. departure from Oban and the 07:55 departure from Craignure had to be cancelled. At 8 a.m., technicians arrived to fix the broken wiper. After the repairs were successfully completed, the ferry resumed operating with the departure from Oban at 3.55 p.m. with four cancelled crossings on the whole.

Ferry suffered pump issue

Wed Jul 29 09:39:59 CEST 2026 Timsen

On July 28, the 'Isle of Mull', serving on the route Oban-Craignure, sufferes a technical issue affecting a pump after the scheduled departure from Oban at 6:15 p.m. The ferry was forced to return to the port, where emergency services attended the ship. The departure from Craignure at 7.25 p.m. was cancelled. The 'Loch Frisa' continued to operate as scheduled. On the morning of July 29, the pump has been repaired, and the 'Isle of Mull' was operating the route as scheduled again. To assist with the backlog of traffic due to the previous cancellations, the 'Clansman' called at Craignure on her way to Oban to pick up remaining passengers.

Bow visor damage needs repairs

Tue Jun 23 19:06:22 CEST 2026 Timsen

The 'Isle of Mull', serving on the route Oban Craignure, suffered a technical issue with the bow visor and had to be removed from service to allow permanent repairs to be carried out between June 23 and July 2. During this period, the ferry 'Isle of Arran' was operating the service along with the ferry 'Loch Frisa'.

Upload News

Ship master data