Allgemeine Informationen

IMO:
MMSI:
244670150
Rufzeichen:
PG8922
Breite:
9.0 m
Länge:
80.0 m
DWT:
Gross Tonnage:
TEU:
Liquid Capacity:
Baujahr:
Klasse:
AIS Typ:
Cargo Ship
Ship type:
Flagge:
Netherlands
Hersteller:
Eigner:
Operator:
Versicherer:

Kurs/Position

Position:
AIS Status :
Moving
Kurs:
207.1° / -128.0
Kompasskurs:
511.0° / -128.0
Geschwindigkeit:
Max. Geschwindigkeit:
Status:
moving
Gebiet:
Netherlands
Zuletzt empfangen::
2026-09-03
vor 65 Tagen
Source:
T-AIS
Von:
Zielort:
ETA:
Summer draft:
Current draft:
Letztes Update:
vor 1208 Tagen
Source:
T-AIS

Nicht sichtbar mit Ihrem Account? Hier Upgraden...

Upgrade

Die letzten Häfen

Bitte anmelden, um die letzten port calls zu sehen

Log in

Die letzten Wegpunkte

Bitte anmelden, um die letzten wegpunkte zu sehen

Log in

Die neuesten Nachrichten

Bernic refloated by Mammoet

Mon Nov 21 10:09:14 CET 2011 Timsen

The "Bernic" was refloated on Nov 19, 2011, at noon. The salvage company Mammoet Maritime using a winch pontoon succeeded in pulling out the vessel out of the silted mouth of the Pommeroeul-Conde Canal. The operation was supported by the salvage tug "Spitsbergen". The recovery was conducted without any problems and damages. An earlier attempt to salvage the "Bernic" by the freighter "Alea" had failed. Ship traffic between Fresnes and Mortagne was halted during the salvage, but around 12 a.m. the "Bernic" resumed its voyage to Belgium with own power. Dutch reports with photos: http://www.schuttevaer.nl/nieuws/actueel/nid16719-bernic-weer-vrij.html http://www.tugspotters.com/dev/index.php?itemid=42033#more

Bernic grounded in closed canal

Thu Nov 10 09:34:43 CET 2011 Timsen

In the evening of Nov 4, 2011, the unloaded "Bernice" has run aground at the lock of Fresnes between the Scheldt river and the Canal Pommeroeul-Condé. The skipper was assuming that this compound to the Belgian Canal Nimy-Blaton was accessible, but the 12 km long canal is closed since 1992 because it had become too shallow and Belgium and France could not agree on the dredging costs. Sbsequently, the work was postponed because local residents objected to the construction of silt deposits along the French River Scheldt. On Nov 7 the ship remained stuck and was waiting for a tug to be pulled off.

News schreiben

Ship master data