The 'Youshun 9' was detained in Tianjin on Oct 19, 2026, with five detainable defiencies: 11110 - LIFE SAVING APPLIANCES - Stowage and provision of liferafts (no responsibility of RO) 07114 - FIRE SAFETY - Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces (no responsibility of RO) 07103 - FIRE SAFETY - Division - decks,bulkheads and penetrations (no responsibility of RO) 02107 - STRUCTURAL CONDITIONS - Ballast, fuel and other tanks (no responsibility of RO) 10109 - SAFETY OF NAVIGATION - Lights, shapes, sound-signals (no responsibility of RO).
News
ANEMOS
The 'Anemos' was detained in Constanta on Oct 12, 2026, with two detainable defiencies: 1113 - Certificate and Documentation - Ship Certificates - Minimum Safe Manning Document - no responsibility of RO; 4109 - Emergency Systems - Fire drills - no responsibility of RO. The tug was released again on Oct 15 and left the port on Oct 17 enroute to Sulina.
HONG RUN 26
The 'Hong Run 26' was detained in Tianjin on Oct 19, 2026, with three detainable defiencies: 07113 - FIRE SAFETY - Fire pumps and its pipes (no responsibility of RO) 07103 - FIRE SAFETY - Division - decks,bulkheads and penetrations (no responsibility of RO) 11101 - LIFE SAVING APPLIANCES - Lifeboats (no responsibility of RO).
BARLA
The 'Barla' was detained in Bartin on Oct 12, 2026, with eight detainable defiencies: 14801 - Pollution prevention - Ballast Water - Ballast Water Management Plan - no responsibility of RO; 15150 - ISM - ISM - no responsibility of RO; 2115 - Structural Conditions - Bulkheads - operational damage - no responsibility of RO; 3104 - Water/Weathertight conditions - Cargo & other hatchways - no responsibility of RO; 3105(2) - Water/Weathertight conditions - Covers (hatchway-, portable-, tarpaulins, etc.) - no responsibility of RO; 6104 - Cargo operations including equipment - Lashing material - no responsibility of RO; 7117 - Fire safety - Jacketed high pressure lines and oil leakage alarm - no responsibility of RO; 7199 - Fire safety - Other (fire safety) - no responsibility of RO.
HAIAN PARK
The 'Haian Park' was detained in Lianyungang on Oct 19, 2026, with three detainable defiencies: 02101 - STRUCTURAL CONDITIONS - Closing devices/watertight doors (no responsibility of RO) 07114 - FIRE SAFETY - Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces (Vietnam Register (VR)) 10109 - SAFETY OF NAVIGATION - Lights, shapes, sound-signals (no responsibility of RO).

